Inspection第 42 / 60 题

Before the leak-down (static) tests, to what pressure should the air system be brought?

a.About 20 psi
b.About 45 psi
c.About 60 psi
d.Governor cutout, about 125 psi (fully charged)

解析

Before performing the applied and released leak-down tests, the system should be fully charged to about governor cutout pressure (around 125 psi). Starting from full charge gives an accurate measure of how much air leaks out over one minute. Testing from a low pressure would not reveal the true leak rate.

免费刷完整 60 道题库 — 无需注册。

同考点相关题目

最近核对: · 审核流程

PrepPass 编辑团队 · 依据官方资料核对 CDL Air Brakes Knowledge Test · 我们如何核对
反馈