Surface Preparation第 4 / 100 题
Under the EPA Renovation, Repair and Painting (RRP) Rule, work that disturbs painted surfaces in housing built before which year generally triggers lead-safe requirements?
a.1998
b.1978
c.1985
d.1960
解析
The RRP Rule applies to housing and child-occupied facilities built before 1978, the year lead-based paint was banned for residential use in the U.S. Firms disturbing more than the de minimis area of paint in these buildings must be certified and use lead-safe work practices. This protects occupants, especially children, from lead dust.
法律依据: EPA RRP Rule免费刷完整 100 道题库 — 无需注册。
同考点相关题目
- Before repainting a previously painted, chalky exterior stucco wall, what is the FIRST thing a painter should do to ensure adhesion?
- What is the primary purpose of caulking gaps around window trim before painting?
- When patching a small nail hole in interior drywall, which sequence is correct?
- Which work practice is REQUIRED by the EPA RRP Rule when disturbing lead-based paint in a pre-1978 home?
- What causes efflorescence, the white crystalline deposit sometimes seen on masonry and concrete?
- Before painting new bare wood trim, why is sanding in the direction of the grain important?