Administration第 86 / 110 题

A finished DWV system is given a final air test instead of water. The system is pressurized to 5 psi and must hold for 15 minutes. What is the pass criterion?

a.Pressure may drop up to 2 psi
b.No pressure drop (the gauge holds 5 psi) for the required time
c.Any reading above 0 psi
d.Pressure must rise

解析

The air test passes only if the system holds the required 5 psi (about a 10 in mercury column equivalent) with no measurable drop for the full duration. A falling gauge indicates a leak that must be located and sealed. Air testing is common where a water test is impractical, such as in cold weather.

法律依据: UPC §712.2