Operational Procedures第 91 / 100 题
Which purpose does a 'bill of materials' (BOM) or asset inventory serve in IT operations?
a.It measures Wi-Fi signal strength
b.It lists components or assets and their details for tracking and procurement
c.It encrypts the hard drive
d.It configures the firewall
解析
A bill of materials or asset inventory itemizes components or devices with relevant details, supporting tracking, procurement, and lifecycle management. It does not measure signal strength or configure security controls.
免费刷完整 100 道题库 — 无需注册。
同考点相关题目
- What is a key reason to use a change board or approval step rather than letting any technician change production systems freely?
- Which basic scripting construct repeats a block of instructions until a condition is met, and is fundamental to automation?
- When a customer becomes upset during a support interaction, which professional communication practice is most appropriate?
- Under change management, why should a change include a documented 'end-user acceptance' or verification step after implementation?
- Which environmental and safety consideration applies when using compressed air to clean dust from a computer?
- What is the main benefit of following a standardized incident-response and documentation procedure during a security event?