Operational Procedures第 92 / 100 题
Under change management, why should a change include a documented 'end-user acceptance' or verification step after implementation?
a.To increase RAM automatically
b.To disable logging
c.To confirm the change works as intended and the issue is resolved
d.To overclock the GPU
解析
Verifying end-user acceptance confirms the change achieved its goal and did not introduce new problems before the change is closed. It does not alter hardware or logging by itself.
免费刷完整 100 道题库 — 无需注册。
同考点相关题目
- Which basic scripting construct repeats a block of instructions until a condition is met, and is fundamental to automation?
- When a customer becomes upset during a support interaction, which professional communication practice is most appropriate?
- Which purpose does a 'bill of materials' (BOM) or asset inventory serve in IT operations?
- Which environmental and safety consideration applies when using compressed air to clean dust from a computer?
- What is the main benefit of following a standardized incident-response and documentation procedure during a security event?
- When disposing of old electronics, which approach aligns with environmental regulations and responsible practice?