Which best describes when the contract price and payment terms must be filled in on a home improvement contract?
a.Before the buyer signs, so no material terms are blank
b.Only if the buyer asks for figures
c.After the first inspection
d.Any time within a week after signing
解析
All material terms, including price and payment schedule, must be completed before the buyer signs; having the buyer sign a contract with blanks to be filled in later is a prohibited practice.
法律依据: B&P §7159免费刷完整 1605 道题库 — 无需注册。
同考点相关题目
- A homeowner insists on paying the full $30,000 up front to 'lock in the price.' The contractor should know that accepting this:
- Which is a required feature of the progress payment schedule in a home improvement contract?
- A contractor performing a $700 service and repair job collects a $150 deposit before starting. This is:
- The 'Three-Day Right to Cancel' notice given to a home improvement buyer must include:
- A residential re-roofing job is priced at $9,500. Which is required?
- A key difference between a service and repair contract and a standard home improvement contract is that the service and repair contract: