Core TradesQuestion 10 of 700

During hot-weather concreting, plastic shrinkage cracking is BEST prevented by:

a.Increasing the mixing water to raise the slump
b.Adding an accelerating admixture to speed the set
c.Delaying all curing until the next day
d.Reducing surface moisture loss by shading, wind breaks, and prompt curing

Explanation

Plastic shrinkage cracks form when the surface dries faster than bleed water rises, so limiting evaporation with shading, wind breaks, fog, and prompt curing is the fix. Adding water weakens the concrete, an accelerator worsens rapid drying, and delaying curing increases moisture loss.

Law Reference: 2025 CA Building Code (CBC) Chapter 19 (Concrete)

Practice all 700 questions free — no signup required.

Related questions on this topic

Last reviewed: · editorial process

PrepPass Editorial Team · Verified against California CSLB General Building (B) Trade Examination · How we review
Report