Core TradesQuestion 142 of 700

In a long horizontal drainage line, cleanouts are generally required at intervals not exceeding approximately:

a.100 feet
b.25 feet
c.50 feet
d.200 feet

Explanation

Cleanouts are required at intervals not exceeding 100 feet on horizontal drainage piping, plus at each aggregate change of direction exceeding a set total, so a drain snake can reach any blockage. 25 and 50 feet are more frequent than required, and 200 feet leaves portions unreachable for cleaning.

Law Reference: 2025 CA Plumbing Code §707.0