SafetyQuestion 670 of 700
On site, a worker finds an extension cord with the grounding prong broken off and the outer jacket split. What is the BEST action?
a.Wrap the split with electrical tape and keep using it
b.Bend the remaining prongs to fit and continue working
c.Remove the cord from service and tag or discard it so it cannot be used until properly repaired or replaced
d.Use it only for low-power tools since the damage is minor
Explanation
Correct: a damaged cord with a missing ground prong and split jacket is a shock and fire hazard and must be removed from service immediately, tagged or discarded so no one uses it until it is properly repaired or replaced. Taping the jacket, forcing bent prongs, or limiting it to 'low-power' tools all leave a hazardous, ungrounded cord in use.
Practice all 700 questions free — no signup required.
Related questions on this topic
- During lockout/tagout (LOTO) on a jobsite, several workers each apply their own personal lock to an energy-isolating device. Who is authorized to remove a given worker's lock?
- Cal/OSHA gives employers two accepted ways to protect workers from ground faults when using temporary power for hand tools. What are they?
- Equipment will operate near an overhead power line energized at 50 kV or less. What MINIMUM clearance must be maintained between the line and any part of the equipment or load, absent other controls?
- An electrician will work near energized conductors up to 20 kV. Which class of hard hat is designed to protect against that level of electrical contact?
- A framer must work on foot alongside moving equipment during daytime on a private site. Under a high-visibility apparel standard, which garment class provides the GREATEST conspicuity for the highest-risk situations such as high traffic speeds or low light?
- On a jobsite, which item of required personal protective equipment must the EMPLOYER generally provide at no cost to the employee?
Last reviewed: · editorial process
PrepPass Editorial Team · Verified against California CSLB General Building (B) Trade Examination · How we review