SafetyQuestion 686 of 700
A crane will operate where the boom or load could approach an overhead power line carrying less than 50 kV. What MINIMUM clearance is generally required between the equipment and the energized line?
a.10 feet
b.3 feet
c.20 feet
d.No clearance is needed if the operator is careful
Explanation
Correct: for lines up to 50 kV, the general minimum clearance for cranes and their loads is 10 feet, increasing for higher voltages. Three feet is far too close for crane work and applies, if anything, to certain low-voltage qualified electrical tasks, not crane operation. Twenty feet is the default when the line voltage is unknown, but for a known sub-50 kV line 10 feet is the stated minimum. Operator care alone is never an acceptable substitute for the clearance.
Practice all 700 questions free — no signup required.
Related questions on this topic
- A crew includes several new hires during a heat wave. What does the heat standard expect regarding acclimatization for workers newly assigned to a high-heat area?
- A mobile crane's load chart shows its rated capacity decreasing as the load is moved farther from the crane. What happens to the crane's safe rated capacity as the operating RADIUS increases?
- A two-leg bridle sling lifts a 4,000-pound load. Each leg makes a 30-degree angle with the horizontal. Using tension per leg = (load / number of legs) / sin(angle), what is the tension in EACH leg?
- During a pre-lift inspection, which condition MOST clearly requires removing a synthetic web sling from service immediately?
- Before a mobile crane lift on soft or uneven ground, which practice BEST helps keep the crane stable while lifting?
- An IIPP under Title 8 must be in writing and include several required elements. Which set BEST describes those elements?
Last reviewed: · editorial process
PrepPass Editorial Team · Verified against California CSLB General Building (B) Trade Examination · How we review