CALCULATION: Concrete costs $165 per cubic yard. A footing pour needs 100 cubic feet of concrete plus 8 percent for waste. What is the approximate concrete cost?

a.About $500
b.About $555
c.About $605
d.About $661

Explanation

100 cubic feet / 27 = 3.70 cubic yards. Add 8 percent waste: 3.70 x 1.08 = 4.00 cubic yards. Cost = 4.00 x $165 = $660, about $661. The lower answers omit the waste factor or miscompute the yardage.

Law Reference: 2025 CA Building Code, Chapter 19 (Concrete)