Planning & EstimatingQuestion 383 of 521
In the normal permit and inspection sequence, when is the final electrical inspection performed?
a.Before rough-in wiring
b.Before trenching for the service
c.Before the panel is installed
d.After all work is complete, before the system is used or occupied
Explanation
The final inspection occurs after all devices, trim, and the panel are complete and just before the system is energized for use or the building is occupied. It is the last step, not something done before rough-in, trenching, or panel installation.
Practice all 521 questions free — no signup required.
Related questions on this topic
- Which set of California regulations contains the worker-safety rules (Cal/OSHA) that apply to electricians on the job?
- Under the optional dwelling method, at what percentage is the nameplate rating of the air-conditioning equipment included in the heating/AC portion of the calculation?
- Using the optional method, a dwelling's 220.82(B) other loads (general lighting, appliances, etc., excluding heating/AC) sum to 40 kVA. What is the calculated demand for that portion?
- Who is normally responsible for obtaining the electrical permit for a project?
- What is the primary purpose of a single-line (one-line) diagram?
- What information does a panel schedule provide?
Last reviewed: · editorial process
PrepPass Editorial Team · Verified against California CSLB C-10 Electrical Trade Examination · How we review