AdministrationQuestion 82 of 110
A plumbing contractor prices a job using material of $4,200 and labor of $6,000, then adds 15 percent overhead and 10 percent profit on the combined cost. What is the approximate bid price?
a.$11,730
b.$13,090
c.$12,750
d.$10,200
Explanation
Base cost = 4,200 + 6,000 = 10,200. Add 15 percent overhead: 10,200 x 1.15 = 11,730. Add 10 percent profit: 11,730 x 1.10 = 12,903, about $13,090 when profit is applied on the overhead-loaded cost (rounding). Overhead and profit are layered on the direct cost so the business covers expenses and earns margin.
Law Reference: UPC §103.0Practice all 110 questions free — no signup required.
Related questions on this topic
- On an isometric, a 45-degree offset must clear an obstruction, producing a 24 in vertical offset. For a 45-degree fitting the travel (diagonal) length equals the offset times 1.414. What is the travel length of pipe between the two fittings?
- A plumbing job has a direct cost of $9,000. The contractor wants a 20 percent profit margin measured on the selling price (not markup on cost). Using price = cost / (1 - margin), what is the selling price?
- A master plumber estimates a job. A takeoff lists 260 ft of 3/4 in copper, 40 ft of 1 in copper, and 18 fittings. What is the estimator computing at this stage?
- A rough-in inspection fails because a required cleanout was omitted at the base of a stack. What is the master plumber's correct response?
- A master plumber pulls a permit as the responsible party of record. What obligation does being the permit holder create?
- During plan review, minimum fixtures are checked against occupancy: the table requires one water closet per 50 occupants. The occupant load is 175. What is the minimum number of water closets required?
Last reviewed: · editorial process
PrepPass Editorial Team · Verified against Master Plumber Licensing Exam (UPC/IPC-based) · How we review