雇佣要求第 985 / 1605 题
Which Industrial Welfare Commission Wage Order most directly governs certain on-site construction, drilling, logging, and mining occupations?
a.Wage Order 4 (professional/technical/clerical)
b.Wage Order 16 (on-site construction, drilling, logging, and mining)
c.Wage Order 7 (mercantile)
d.Wage Order 5 (public housekeeping)
解析
IWC Wage Order 16 specifically covers certain on-site occupations in the construction, drilling, logging, and mining industries, addressing hours, meal and rest periods, and related conditions tailored to those field operations. Contractors performing on-site construction labor should consult Wage Order 16 (in addition to the Labor Code) because it contains industry-specific rules that differ from the mercantile or clerical wage orders.
法律依据: Labor Code §226.7; §512; construction wage order (Wage Order 16)免费刷完整 1605 道题库 — 无需注册。
同考点相关题目
- May a California employer provide itemized wage statements electronically instead of on paper?
- A contractor's timekeeping system rounds employee clock-in and clock-out times to the nearest 15 minutes. Under evolving California law, what is the safest practice?
- A foreman tells workers to clock out at 5:00 p.m. but then keep cleaning tools and loading the truck for 20 more minutes 'off the clock.' How must this time be treated?
- In addition to standard rest breaks, outdoor construction workers may be entitled to 'cool-down recovery periods.' How are these recovery periods compensated?
- Why must California employers regularly re-check the applicable minimum wage rather than assuming it stays constant?
- A contractor pays a jobsite coordinator a fixed weekly salary but the coordinator spends most of the day doing manual labor alongside the crew. Is the coordinator automatically exempt from overtime?