In addition to standard rest breaks, outdoor construction workers may be entitled to 'cool-down recovery periods.' How are these recovery periods compensated?
a.As paid time; recovery periods to prevent heat illness are counted as hours worked
b.Only if the temperature exceeds 105 degrees
c.As a deduction from the lunch period
d.As unpaid breaks the worker must make up
解析
California requires paid 'cool-down recovery periods' in the shade for outdoor workers to prevent heat illness, and like rest periods, this time is counted as hours worked and must be paid. Denying a needed recovery period can trigger a premium comparable to the §226.7 rest-period premium. These recovery periods are separate from, and additional to, regular rest and meal breaks.
法律依据: Labor Code §226.7; heat and recovery periods免费刷完整 1605 道题库 — 无需注册。
同考点相关题目
- A contractor's timekeeping system rounds employee clock-in and clock-out times to the nearest 15 minutes. Under evolving California law, what is the safest practice?
- A foreman tells workers to clock out at 5:00 p.m. but then keep cleaning tools and loading the truck for 20 more minutes 'off the clock.' How must this time be treated?
- Which Industrial Welfare Commission Wage Order most directly governs certain on-site construction, drilling, logging, and mining occupations?
- Why must California employers regularly re-check the applicable minimum wage rather than assuming it stays constant?
- A contractor pays a jobsite coordinator a fixed weekly salary but the coordinator spends most of the day doing manual labor alongside the crew. Is the coordinator automatically exempt from overtime?
- Under California law, can an individual owner, officer, or managing agent be held personally liable for certain wage violations, not just the corporate entity?