Your takeoff shows 14 cubic yards of concrete needed, and the supplier quotes $185 per cubic yard delivered. What is the estimated material cost for the concrete?
a.$2,590
b.$199
c.$25,900
d.$1,850
Explanation
Cost = quantity x unit price = 14 x $185 = $2,590 (a). Option (b) adds instead of multiplying. Option (c) misplaces the decimal. Option (d) uses only 10 cubic yards.
Practice all 700 questions free — no signup required.
Related questions on this topic
- When preparing a material takeoff, why does an estimator add a waste/allowance factor to the net measured quantities?
- A crew of 3 workers works 5 days at 8 hours per day. At a fully burdened rate of $52 per hour, what is the estimated labor cost?
- A tile installer prices work at $9.50 per square foot installed. For a job of 850 square feet, what is the estimated installed cost?
- A painter rolls one coat at a rate of 150 square feet per hour. For a single coat on 3,000 square feet, what is the MINIMUM number of labor-hours to include in the estimate?
- Two contractors discuss pricing. What is the correct distinction between 'markup' and 'gross margin'?
- A job costs $16,000 and is sold for $20,000. What is the gross MARGIN percentage on the selling price?
Last reviewed: · editorial process
PrepPass Editorial Team · Verified against California CSLB General Building (B) Trade Examination · How we review