SafetyQuestion 652 of 700
Who must inspect a scaffold for visible defects, and how often, before it is used?
a.Any available worker, once a week
b.A licensed engineer, once at erection only
c.The scaffold manufacturer, monthly
d.A competent person, before each work shift and after any event that could affect its structural integrity
Explanation
Correct: a competent person must inspect the scaffold before each work shift and after any occurrence (such as a storm or being struck) that could affect structural integrity. A weekly check by any worker, a one-time engineer inspection, or monthly manufacturer visits all miss the required per-shift, competent-person inspection that catches loose planks, damaged parts, and settlement.
Practice all 700 questions free — no signup required.
Related questions on this topic
- A supported scaffold and its components are being specified. Each part of the scaffold and its supports must be capable of holding at least how many times the maximum intended load without failure?
- Wood platform planks on a scaffold are supported at each end. Where planks are overlapped rather than butted, the overlap must occur over a support and extend at least how far past the centerline of the support?
- Workers need to reach a scaffold platform 9 feet above the base. Which access method is required under Cal/OSHA?
- CALCULATION: A free-standing supported scaffold has a minimum base width of 5 feet. Using the common 4:1 height-to-base ratio, at what height must the scaffold first be tied, guyed, or braced to the structure to prevent tipping?
- On a large jobsite a scaffold tagging system is used at access points. A worker sees a YELLOW tag on a scaffold. What does this MOST likely indicate?
- A supported scaffold is being erected on graded soil. What is the BEST practice for the scaffold's footing?