合同与履行第 777 / 1605 题
The requirement that a home improvement contract be signed before work begins protects the buyer by:
a.Waiving the contractor's liability
b.Ensuring the terms and cancellation rights are set before the buyer is committed to ongoing work
c.Guaranteeing the lowest price
d.Eliminating the need for permits
解析
Requiring signature before work begins ensures the buyer knows the full terms and retains the right to cancel before becoming entangled in a partially completed project.
法律依据: B&P §7159免费刷完整 1605 道题库 — 无需注册。
同考点相关题目
- A homeowner requests a $500 furnace repair by phone. The contractor may present a service and repair contract that must include:
- A contractor prints two identical cancellation notices and attaches them to the contract. This satisfies the requirement that the buyer receive:
- On a $3,000 fence job with no joint control, the maximum lawful down payment is:
- Which best distinguishes when a contractor should use a service and repair contract versus a home improvement contract?
- A home improvement contract's list of documents incorporated by reference (such as plans and specifications) must be:
- A contractor's estimate is not the same as a contract because the required home improvement contract must, unlike a mere estimate: