Drainage, Waste & Vent第 17 / 120 题

Under the UPC, where does the building drain end and the building sewer begin?

a.At the face of the exterior wall
b.At the property line
c.5 ft outside the building wall
d.2 ft outside the building wall

解析

The UPC sets the boundary between building drain and building sewer at 2 ft outside the building wall, which is where the sewer designation and its materials rules take over. The exterior wall face and the property line are not the code dividing point, and the 5 ft dimension is the boundary used by some other model codes, not the UPC.

免费刷完整 120 道题库 — 无需注册。

同考点相关题目

最近核对: · 审核流程

PrepPass 编辑团队 · 依据官方资料核对 Journeyman Plumber Licensing Exam (UPC/IPC-based) · 我们如何核对
反馈