Finish TradesQuestion 236 of 700

Before nailing down solid strip hardwood over a wood subfloor, an installer checks moisture content of BOTH the flooring and the subfloor. Best practice is to keep the difference between them within about:

a.No limit; any difference is fine
b.2 to 4 percentage points
c.15 percentage points
d.20 percentage points

Explanation

Wood flooring guidance keeps flooring and subfloor moisture within roughly 2 to 4 percentage points (tighter for wide planks) so the boards do not shrink or cup after installation. Ignoring the difference or allowing 15 to 20 points guarantees gaps, cupping, or buckling.

Practice all 700 questions free — no signup required.

Related questions on this topic

Last reviewed: · editorial process

PrepPass Editorial Team · Verified against California CSLB General Building (B) Trade Examination · How we review
Report