SafetyCâu 677 / 700
For respirable crystalline silica in construction, the permissible exposure limit is about 50 micrograms per cubic meter as an 8-hour average. At approximately what airborne level does the 'action level' trigger additional requirements such as exposure monitoring?
a.About 25 micrograms per cubic meter (8-hour average)
b.About 5 micrograms per cubic meter
c.About 100 micrograms per cubic meter
d.About 250 micrograms per cubic meter
Giải thích
Correct: the action level is roughly half the PEL, about 25 micrograms per cubic meter as an 8-hour average; reaching it triggers duties such as exposure assessment and medical surveillance eligibility. Five micrograms is far too low and matches lead-related figures, not silica. One hundred and 250 micrograms both exceed the PEL itself, so they cannot be the action level.
Luyện miễn phí toàn bộ 700 câu hỏi — không cần đăng ký.
Câu hỏi liên quan cùng chủ đề
- Before an employee is fit-tested for a tight-fitting respirator, what must occur FIRST?
- A worker needs protection where the airborne contaminant is about 8 times the exposure limit. A half-mask air-purifying respirator has an assigned protection factor (APF) of 10. What does that APF tell you?
- A worker with a full beard is assigned to wear a tight-fitting half-face respirator. What is the MAIN problem?
- A contractor wants to control silica by following the standard's 'Table 1' approach rather than doing exposure sampling. When using a handheld masonry saw outdoors, which Table 1 control is specified?
- On a lead-in-construction job, the airborne action level is about 30 micrograms per cubic meter and the permissible exposure limit is about 50 micrograms per cubic meter (8-hour average). What is the PRIMARY significance of exposure reaching the action level?
- A contractor plans to disturb about 150 square feet of asbestos-containing wall material during a remodel. Which requirement applies in California?