Communication and SWMS
How safety information is shared on site, and the role of Safe Work Method Statements for high-risk construction work.
Safe Work Method Statements
A SWMS sets out high-risk construction work, its hazards and the control measures, and must be prepared before the work starts and followed on site. It helps workers do the job safely.
High-risk construction work
High-risk work includes tasks such as a risk of a fall, work in trenches or confined spaces, near traffic, or with asbestos or energised electrical installations. These require a SWMS.
Site communication
Site inductions, toolbox talks, signage and hand signals all share safety information. Complete the induction before starting work so you understand the site's rules, hazards and emergency procedures.