Subfloor Evaluation, Preparation, and Material Acclimation
About 20% of the C-15 exam covers removing old flooring, preparing and testing the subfloor, underlayments, acclimation and, new in 2026, moisture mitigation. This page is a short survey; the PrepPass C-15 study guide teaches each step with Cal/OSHA's asbestos rules and the manufacturers' moisture limits.
Removing old flooring
Vinyl and asphalt flooring installed no later than 1980 is presumed to contain asbestos under Cal/OSHA; it may not be sanded, dry-swept, ripped up or mechanically chipped outside a negative-pressure enclosure.
Moisture testing
Concrete is tested by in situ RH probes (ASTM F2170) or calcium chloride (ASTM F1869) at service conditions; the flooring or adhesive manufacturer sets the limit.
Acclimation and mitigation
Acclimation periods are product-specific; a slab over the limit is dried further or treated with a moisture remediation system, then bond-tested.