Chapter 3 of 525% of exam

Cabinet Installation

Cabinet installation runs from demolition and hazard identification (lead paint and asbestos) through site preparation, setting and fastening cabinets and tops, and finishing. CSLB weights this section at 25%, the largest section. For worked examples, named traps and a full practice exam at CSLB's weights, see the PrepPass C-6 Cabinet, Millwork and Finish Carpentry study guide.

Lead-safe renovation

Paid renovation of painted surfaces in pre-1978 housing and child-occupied facilities follows the federal RRP rule.

Minor repair limit
6 sq ft per room inside, 20 sq ft outside; never window replacement or demolition of painted surfaces.
40 CFR §745.83

Asbestos

Thermal system insulation and surfacing material in buildings built no later than 1980 are presumed to contain asbestos.

PACM
Presumed asbestos-containing material in buildings constructed no later than 1980.
Cal. Code Regs. tit. 8 §1529

Setting cabinets

Condition cabinets in the room, set from the high point, shim with concealed shims, and fasten through the back into framing.

Tolerance (federal guide spec)
Level, plumb and true to 1/8 inch in 96 inches.
UFGS 06 41 16.00 10