In a wood-framed shear wall resisting seismic loads, what is the PRIMARY function of a hold-down device installed at the wall ends?
a.To level the top plate during framing
b.To provide a nailing surface for siding
c.To resist overturning uplift and anchor the end post to the foundation
d.To act as a vapor barrier at the wall base
Giải thích
A hold-down ties the shear wall's end post (chord) to the foundation to resist the uplift produced when lateral forces try to overturn the wall. It does not level plates, provide siding nailing, or act as a vapor barrier; those are unrelated framing or moisture functions.
Trích dẫn luật: 2025 CA Residential Code §R602.10Luyện miễn phí toàn bộ 700 câu hỏi — không cần đăng ký.
Câu hỏi liên quan cùng chủ đề
- Guards on open sides of walking surfaces in a dwelling must be at least what height above the walking surface or, for stairs, the line connecting the tread nosings?
- A required stair handrail must be mounted so its top is within what vertical range above the tread nosings?
- For a conventionally framed wall anchored to a concrete foundation, anchor bolts of at least 1/2-inch diameter must generally be spaced no more than what distance on center?
- When applying three-coat Portland cement plaster (stucco) over wood framing on an exterior wall, a weep screed must be installed at the foundation plate line at least how far above the earth?
- Traditional three-coat stucco applied over metal lath on a framed wall should have what approximate MINIMUM total nominal thickness measured from the face of the lath?
- To resist lateral separation of an exterior wood deck from the dwelling during seismic or live loads, which connection is the BEST practice at the ledger-to-band-joist interface?
Cập nhật gần nhất: · quy trình kiểm tra
Đội Ngũ Biên Tập PrepPass · Đối chiếu với California CSLB General Building (B) Trade Examination · Quy trình kiểm tra