Spoil (excavated soil) is being placed next to an open trench. Where should the spoil pile be kept to reduce cave-in risk?
a.Right at the edge of the trench for easy backfill
b.Balanced on the shoring
c.Inside the trench with the workers
d.Set back at least 2 feet from the trench edge
Giải thích
Cal/OSHA requires spoil piles and other loads to be kept back at least 2 feet from the trench edge so their weight does not surcharge the trench wall and trigger a collapse. Option d is correct. Placing spoil at the edge (a) adds dangerous load, resting it on the shoring (b) overloads the system, and putting it in the trench (c) endangers the workers directly.
Trích dẫn luật: Cal/OSHA Title 8, Construction Safety OrdersLuyện miễn phí toàn bộ 700 câu hỏi — không cần đăng ký.
Câu hỏi liên quan cùng chủ đề
- An overhead power line runs near a site where a crane and a dump truck will operate. What is the BEST way to prevent electrocution from contact with the line?
- An excavation is 6 feet deep and workers must climb in and out repeatedly. What egress does Cal/OSHA generally require?
- Workers on a jobsite are exposed to loud equipment noise throughout the shift. At approximately what average noise level does Cal/OSHA require a hearing conservation program to begin?
- A general contractor holds a weekly toolbox safety meeting. What is the PRIMARY safety-program benefit of documenting these meetings and near-miss reports?
- A lane closure is set up on a higher-speed roadway. According to California MUTCD principles, what is the FIRST element a driver should encounter approaching the work zone?
- A worker will enter a below-grade vault that may contain low oxygen or toxic gas. What is the BEST practice before entry into this permit-required confined space?