SafetyCâu 687 / 700
During a pre-lift inspection, which condition MOST clearly requires removing a synthetic web sling from service immediately?
a.Light surface fuzzing of the fibers with no cuts
b.Melting, charring, or acid/caustic burns on the sling, or missing/illegible identification tag
c.A small amount of dust on the sling body
d.The sling has been used on more than one job
Giải thích
Correct: melting, charring, chemical (acid or caustic) burns, or a missing/illegible capacity tag are all listed removal-from-service criteria because they signal lost strength or unknown rating. Light surface fuzzing without cuts or reduction of the load-bearing fibers is generally acceptable. Dust alone is not damage. Prior use on multiple jobs does not condemn a sling; its actual condition and legible tag do.
Luyện miễn phí toàn bộ 700 câu hỏi — không cần đăng ký.
Câu hỏi liên quan cùng chủ đề
- A mobile crane's load chart shows its rated capacity decreasing as the load is moved farther from the crane. What happens to the crane's safe rated capacity as the operating RADIUS increases?
- A two-leg bridle sling lifts a 4,000-pound load. Each leg makes a 30-degree angle with the horizontal. Using tension per leg = (load / number of legs) / sin(angle), what is the tension in EACH leg?
- A crane will operate where the boom or load could approach an overhead power line carrying less than 50 kV. What MINIMUM clearance is generally required between the equipment and the energized line?
- Before a mobile crane lift on soft or uneven ground, which practice BEST helps keep the crane stable while lifting?
- An IIPP under Title 8 must be in writing and include several required elements. Which set BEST describes those elements?
- Which California employers are required to establish and maintain a written IIPP?