Where must the initiation device for PV rapid shutdown be located?
a.Inside the inverter only
b.Readily accessible and located outside the building, or at an approved location for first responders
c.It is not required
d.Only on the roof next to the array
Giải thích
Section 690.12(C) requires the rapid-shutdown initiation device to be readily accessible and located outside the building or at another location approved for first responders. Placing it inside the inverter or hidden at the array would defeat its purpose of quick emergency access.
Trích dẫn luật: 2023 NEC §690.12Luyện miễn phí toàn bộ 521 câu hỏi — không cần đăng ký.
Câu hỏi liên quan cùng chủ đề
- How does a Class 3 circuit differ from a Class 2 circuit?
- When communications conductors share an enclosure with electric light or power conductors, what is required?
- What distinguishes a non-power-limited fire alarm (NPLFA) circuit from a power-limited (PLFA) circuit?
- How must exposed non-current-carrying metal parts of PV module frames and equipment be treated?
- What marking must a generator carry?
- An on-site generator serving as the emergency source must have an on-site fuel supply sufficient for what minimum operating time at full load?
Cập nhật gần nhất: · quy trình kiểm tra
Đội Ngũ Biên Tập PrepPass · Đối chiếu với California CSLB C-10 Electrical Trade Examination · Quy trình kiểm tra