A complete bid price for an electrical project generally consists of which of the following?
a.Material, labor, overhead, and profit
b.Labor only
c.Material only
d.Permit fees only
Giải thích
A full bid adds up direct material, direct labor, overhead (indirect business costs), and profit. Leaving out any of these, such as bidding labor or material alone, would not cover the true cost of doing the work.
Luyện miễn phí toàn bộ 521 câu hỏi — không cần đăng ký.
Câu hỏi liên quan cùng chủ đề
- The 2023 NEC requires one- and two-family dwellings to have an emergency disconnect installed where?
- For 120/240 V equipment likely to require examination while energized (Condition 1), what is the minimum depth of working space in front of it?
- What is the minimum width of working space in front of electrical equipment (or the width of the equipment, whichever is greater)?
- What is the minimum headroom (height) of working space about electrical equipment such as panelboards?
- What is the line current of a 30 kVA, three-phase load supplied at 208 V?
- The NEC is updated on a three-year cycle. The 2023 NEC directly follows which prior edition?
Cập nhật gần nhất: · quy trình kiểm tra
Đội Ngũ Biên Tập PrepPass · Đối chiếu với California CSLB C-10 Electrical Trade Examination · Quy trình kiểm tra