Planning & EstimatingCâu 74 / 100
When estimating a job, which cost category covers wages, taxes, and workers' compensation for crew hours?
a.Material cost
b.Equipment rental
c.Labor cost
d.Permit fees
Giải thích
Labor cost includes crew wages plus payroll burdens such as payroll taxes and workers' compensation insurance. Estimators calculate labor from the hours a task takes multiplied by a fully burdened labor rate. Underestimating labor is a common cause of unprofitable jobs.
Luyện miễn phí toàn bộ 100 câu hỏi — không cần đăng ký.
Câu hỏi liên quan cùng chủ đề
- To find the area of a circular planting bed with a 20-foot diameter, which calculation is correct?
- A landscape plan uses a scale of 1 inch = 10 feet. A bed measures 4 inches long on the plan. What is its actual length?
- A patio is 12 ft by 15 ft and will be poured 4 inches thick. How many cubic yards of concrete are needed (before waste)?
- How many square feet are in a rectangular lawn that is 45 feet by 60 feet?
- A fertilizer is applied at 4 pounds per 1,000 square feet. How much is needed for 5,000 square feet?
- Before starting many hardscape or grading projects, a contractor typically must obtain what from the local jurisdiction?
Cập nhật gần nhất: · quy trình kiểm tra
Đội Ngũ Biên Tập PrepPass · Đối chiếu với California CSLB C-27 Landscaping Trade Exam · Quy trình kiểm tra