Planning & EstimatingCâu 78 / 100
Why should surface prep be estimated as a separate labor item?
a.Prep can take as much or more time than painting and varies greatly with surface condition
b.Prep never takes any time
c.Prep is always exactly 5% of the job
d.Prep is included free by the paint manufacturer
Giải thích
Preparation such as scraping, sanding, patching, and cleaning varies widely with the condition of the surface and can equal or exceed the painting time. Estimating it separately produces a realistic bid and protects the contractor's margin. Underestimating prep is a leading cause of unprofitable paint jobs.
Luyện miễn phí toàn bộ 100 câu hỏi — không cần đăng ký.
Câu hỏi liên quan cùng chủ đề
- When estimating exterior siding area, why do many painters NOT deduct small openings like windows and doors?
- What is the purpose of reviewing the project plans and specifications before bidding a paint job?
- To estimate labor, a painter uses a production rate. If one painter coats 150 sq ft per hour and the job is 1,200 sq ft for one coat, how many labor-hours are needed?
- A ceiling measures 20 ft by 15 ft. How much area must be covered?
- When would a contractor typically need to obtain a permit related to painting work?
- A job requires 18 gallons of paint at $45 per gallon. What is the material cost for the paint?