When must a plumbing permit generally be obtained relative to starting the work?
a.Any time within a year after finishing
b.Only if an inspector happens to visit
c.After the final inspection
d.Before the work covered by the permit begins
Giải thích
A permit must be secured before starting the regulated work, since it authorizes the installation and sets up the required inspections. Beginning work without a permit can lead to stop-work orders, fines, and forced exposure of concealed work. Plan the permit into the schedule so it is in hand before the crew mobilizes.
Luyện miễn phí toàn bộ 360 câu hỏi — không cần đăng ký.
Câu hỏi liên quan cùng chủ đề
- A plan symbol shows a circle with the letters "CO" next to a drain line at grade. What does this indicate?
- Why do estimators apply a difficulty or productivity factor to base labor units on some jobs?
- On a plumbing plan, what does a "point of connection" (POC) note typically identify?
- A single-line water piping diagram on the plans is best described as what?
- When planning the drainage layout, why must roof and storm drainage generally be kept separate from the sanitary drainage system?
- A bid schedule shows the plumbing rough-in must be complete before the concrete slab is poured. What does this tell you about coordination?
Cập nhật gần nhất: · quy trình kiểm tra
Đội Ngũ Biên Tập PrepPass · Đối chiếu với California CSLB C-36 Plumbing Trade Examination · Quy trình kiểm tra