AdministrationCâu 86 / 110
A finished DWV system is given a final air test instead of water. The system is pressurized to 5 psi and must hold for 15 minutes. What is the pass criterion?
a.Pressure may drop up to 2 psi
b.No pressure drop (the gauge holds 5 psi) for the required time
c.Any reading above 0 psi
d.Pressure must rise
Giải thích
The air test passes only if the system holds the required 5 psi (about a 10 in mercury column equivalent) with no measurable drop for the full duration. A falling gauge indicates a leak that must be located and sealed. Air testing is common where a water test is impractical, such as in cold weather.
Trích dẫn luật: UPC §712.2Luyện miễn phí toàn bộ 110 câu hỏi — không cần đăng ký.
Câu hỏi liên quan cùng chủ đề
- A rough-in inspection fails because a required cleanout was omitted at the base of a stack. What is the master plumber's correct response?
- A master plumber pulls a permit as the responsible party of record. What obligation does being the permit holder create?
- During plan review, minimum fixtures are checked against occupancy: the table requires one water closet per 50 occupants. The occupant load is 175. What is the minimum number of water closets required?
- A base permit fee is $290. The jurisdiction adds a 12 percent state surcharge on the permit fee plus a flat $40 plan-review fee. What is the total the contractor pays?
- A change order adds two lavatories at 1 DFU each and one water closet at 4 DFU to a branch. By how many drainage fixture units does the branch load increase, so plan review can confirm the pipe is still adequate?
- An inspector finds that a backflow assembly was installed but never tested by a certified tester. What documentation closes this item?