SterilizationCâu 32 / 100

A technician opens the department at the start of the day shift and must schedule the Bowie-Dick test for a dynamic-air-removal sterilizer. How often is the test required?

a.Once per week, on the same day each week
b.In every load that contains an implant
c.Only after a repair to the vacuum pump
d.Each day the sterilizer is used, in the first cycle of the day after the warm-up cycle

Giải thích

The Bowie-Dick test verifies air removal and steam penetration and is run daily in an otherwise empty chamber before the first processed load, typically after a warm-up cycle. It is an air-removal test, not a lethality test, so it does not belong in implant loads and does not replace biological monitoring. It is also repeated after repairs, but that is in addition to, not instead of, the daily requirement.

Trích dẫn luật: AAMI ST79

Luyện miễn phí toàn bộ 100 câu hỏi — không cần đăng ký.

Câu hỏi liên quan cùng chủ đề

Cập nhật gần nhất: · quy trình kiểm tra

Đội Ngũ Biên Tập PrepPass · Đối chiếu với HSPA Certified Registered Central Service Technician (CRCST) Exam · Quy trình kiểm tra
Báo lỗi