Chapter 6 of 814% of exam

Emissions Tests: Test Procedures

This area covers running the tailpipe and OBD tests themselves: ASM, TSI and the OIS inspection, and what the results mean.

Tailpipe tests on the BAR-97

The ASM is a loaded test on the dynamometer with two loaded-mode sequences, known as the 50/15 test (15 mph) and the 25/25 test (25 mph). HC, CO and NOx are measured in each. The TSI is an unloaded test at idle and at about 2,500 RPM, measuring HC and CO. HC and NOx are reported in parts per million; CO, CO2 and O2 in percent. The inspector follows the EIS prompts for probe placement and RPM pickup, keeps the vehicle within the speed and RPM windows, and lets the analyzer decide pass or fail against the standards for that vehicle. A vehicle whose emissions are far above the standard is identified as a gross polluter, and its certification is handled under the manual's gross polluter rules.

The OBD inspection

On the OIS the inspector connects to the diagnostic link connector and the system reads the vehicle. BAR's OBD Test Reference sets the pass criteria. The MIL must light with the key on, engine off, and go out with the engine running, and it must not be commanded on. Readiness monitors: 1996 to 1999 gasoline vehicles may have any one monitor incomplete; 2000 and newer gasoline vehicles may have only the evaporative monitor incomplete; 1998 to 2006 diesels none; 2007 and newer diesels only the particulate filter and NMHC catalyst monitors. Continuous monitors are ignored on gasoline vehicles. Permanent diagnostic trouble codes (PDTCs) have been part of the inspection since July 1, 2019 for 2010 and newer vehicles. A PDTC fails the vehicle whether or not the MIL is on, unless the vehicle has completed at least 15 warm-up cycles and 200 miles since codes were cleared. Since July 19, 2021 the OIS also checks for modified software; a vehicle with non-approved software fails and the VIR shows "Modified Software." A vehicle that will not communicate fails, and the Test Reference lists common causes and vehicles with known problems.

After the test

Every inspection ends with a VIR. On a pass the certificate is transmitted electronically. If an EIS test was completed during a VID communication failure, DMV may not yet have the record and may ask the customer for the VIR.

Key numbers and deadlines

• Monitors: 1996–1999 gas, any one; 2000+ gas, evaporative only; 1998–2006 diesel, none; 2007+ diesel, particulate filter and NMHC catalyst. • PDTC: 2010 and newer, since July 1, 2019; ignored after 15 warm-up cycles and 200 miles. • Modified software check: since July 19, 2021.

Worked example

A 2014 gasoline sedan arrives with the MIL off and no stored codes. The owner replaced a sensor and cleared codes two days ago. The OIS finds the catalyst and oxygen sensor monitors incomplete and a permanent code. The vehicle fails on readiness (only the evaporative monitor may be incomplete) and on the PDTC, since it has not accumulated 15 warm-up cycles and 200 miles.

Exam traps

• "MIL off" does not mean "pass." • A PDTC cannot be cleared with a scan tool or by disconnecting the battery. • The OIS has no tailpipe probe and no diagnostic mode. • BAR announced regulations effective October 1, 2025 that would require all monitors complete, but said the current criteria remain in use while it collects data. Study the criteria above and check BAR's OBD Test Reference before your exam.

Keep going: the full California Smog Check Inspector (BAR) guide covers every section of the exam. California Smog Check Inspector Exam — Study Guide, 2027 Edition — PDF + EPUB, $14.99 · 14-day refund →

Studying in order?

Practice stays free. The full California Smog Check Inspector (BAR) study guide is the material itself, taught start to finish — a downloadable PDF + EPUB you keep.

Get the book — $14.99