Services & Distribution

A 208-V, three-phase feeder supplies a 120,000-VA load. What is the calculated feeder current?

  • a.577 A
  • b.288 A
  • c.333 A✓
  • d.200 A

Three-phase current = 120,000 / (1.732 x 208) = 333 A.

Services & Distribution

A 225-A busbar is fed by a 225-A main breaker at one end. Using the 120% rule, what is the maximum back-fed inverter (PV) supply breaker at the opposite end?

  • a.60 A
  • b.45 A✓
  • c.40 A
  • d.30 A

2023 NEC 705.12(B)(3): 120% of the 225-A busbar = 270 A; subtract the 225-A main: 270 - 225 = 45 A maximum for the back-fed supply breaker.

Services & Distribution

A feeder is protected by a 500-A overcurrent device. What is the minimum copper equipment grounding conductor?

  • a.#2 AWG✓
  • b.#3 AWG
  • c.#4 AWG
  • d.#1 AWG

2023 NEC Table 250.122: a 500-A overcurrent device requires a #2 Cu equipment grounding conductor.

Services & Distribution

A feeder is protected by an 800-A overcurrent device. What is the minimum copper equipment grounding conductor?

  • a.1/0 AWG✓
  • b.#2 AWG
  • c.#1 AWG
  • d.2/0 AWG

2023 NEC Table 250.122: an 800-A overcurrent device requires a 1/0 Cu equipment grounding conductor.

Services & Distribution

A feeder is protected by a 1,200-A overcurrent device. What is the minimum copper equipment grounding conductor?

  • a.3/0 AWG✓
  • b.4/0 AWG
  • c.#1 AWG
  • d.2/0 AWG

2023 NEC Table 250.122: a 1,200-A overcurrent device requires a 3/0 Cu equipment grounding conductor.

Services & Distribution

A service uses 1/0 AWG copper ungrounded conductors. What is the minimum copper grounding electrode conductor?

  • a.#4 AWG
  • b.#2 AWG
  • c.#6 AWG✓
  • d.#8 AWG

2023 NEC Table 250.66: service conductors of 1 or 1/0 Cu require a #6 Cu grounding electrode conductor.

Services & Distribution

A service uses 750-kcmil copper ungrounded conductors. What is the minimum copper grounding electrode conductor?

  • a.2/0 AWG✓
  • b.3/0 AWG
  • c.1/0 AWG
  • d.#1 AWG

2023 NEC Table 250.66: over 600 through 1,100 kcmil Cu requires a 2/0 Cu grounding electrode conductor.

Services & Distribution

A separately derived system (transformer) has 600-kcmil copper derived conductors. What is the minimum copper supply-side bonding jumper?

  • a.1/0 AWG✓
  • b.#1 AWG
  • c.2/0 AWG
  • d.#2 AWG

2023 NEC 250.30(A)(2) with Table 250.102(C)(1): over 350 through 600 kcmil Cu requires a 1/0 Cu bonding jumper.

Services & Distribution

Service-entrance conductors supply a 150-A continuous load. What minimum conductor ampacity is required?

  • a.187.5 A✓
  • b.150 A
  • c.200 A
  • d.165 A

2023 NEC 230.42(A): service conductors must carry at least 125% of the continuous load: 150 x 1.25 = 187.5 A.

Services & Distribution

A service has 3/0 AWG copper ungrounded conductors. What is the minimum copper bonding jumper for the metal underground water pipe?

  • a.#2 AWG
  • b.#6 AWG
  • c.#4 AWG✓
  • d.#8 AWG

2023 NEC 250.104(A)(1) sizes the water-pipe bonding jumper from Table 250.66: 2/0-3/0 Cu service conductors require a #4 Cu bonding jumper.

Want these explained in order? Master Electrician — Advanced NEC Study Guide (2026) — PDF + EPUB, $14.99 · 14-day refund →

Services & Distribution

Under 2023 NEC 110.9, a circuit breaker or fuse intended to interrupt fault current must have an interrupting rating that is:

  • a.125% of the continuous load
  • b.equal to the connected load current
  • c.at least the available fault current at its line terminals✓
  • d.the same as the largest downstream conductor ampacity

2023 NEC 110.9 requires the device's interrupting rating to be at least the available fault current where it is applied; ampacity and load current size the device only for normal operation.

Services & Distribution

A downstream circuit breaker has an interrupting rating below the available fault current. It may still be applied only if:

  • a.the connected load is noncontinuous
  • b.it is a molded-case type
  • c.it is derated 20% for continuous operation
  • d.it is part of a listed, tested series combination with the line-side device✓

2023 NEC 240.86 permits a lower-rated downstream breaker only as part of a tested, marked series combination with the line-side OCPD (or under engineering supervision). Derating does not raise interrupting rating.

Services & Distribution

Service phase conductors total 1,100 kcmil Cu per phase. Using the bonding table, what is the minimum copper main bonding jumper?

  • a.1/0 AWG
  • b.2/0 AWG✓
  • c.#1 AWG
  • d.3/0 AWG

2023 NEC 250.28(D)(1) with Table 250.102(C)(1): over 600 through 1,100 kcmil Cu requires a 2/0 Cu main bonding jumper.

Services & Distribution

What is the maximum rating of the overcurrent device that may protect a 400-A-rated panelboard?

  • a.350 A
  • b.450 A
  • c.400 A✓
  • d.500 A

2023 NEC 408.36: a panelboard must be protected by an overcurrent device rated no more than the panelboard rating, so 400 A is the maximum.

Services & Distribution

A single made electrode (ground rod) must be supplemented by a second electrode unless its resistance to earth does not exceed:

  • a.1 ohm
  • b.5 ohms
  • c.25 ohms✓
  • d.10 ohms

2023 NEC 250.53(A)(2): a single rod, pipe, or plate electrode must be supplemented unless it has a resistance to earth of 25 ohms or less.

Services & Distribution

A branch circuit is protected by a 30-A overcurrent device. What is the minimum copper equipment grounding conductor?

  • a.#12 AWG
  • b.#10 AWG✓
  • c.#14 AWG
  • d.#8 AWG

2023 NEC Table 250.122: overcurrent devices from 30 through 60 A require a #10 Cu equipment grounding conductor.

How hard is the exam?

Master electrician licensing is state-administered and NEC-based, so format varies by state. In Texas, for example, the exam has two open-book portions (2023 NEC) — 75 NEC-knowledge items and 33 calculation items (108 total) — each needing 70% to pass, for a $78 fee. Electricians earn a median of about $62,350/year (BLS, May 2024).

Recommended study hours
80-150 hours for most — master exams add heavier calculations and code-application depth over journeyman.
Published pass rate
19.08% (the source does not say which attempts it counts) (n = 3,946); 22.21% (the source does not say which attempts it counts) (n = 3,472) — Texas TDLR, FY 2025. Read those as two exams, not one: TDLR has no row called “Master Electrician”, only “Master Calculations” (the first figure) and “Master NEC” (the second). Anyone quoting a single 19% Texas master pass rate has silently dropped half the exam. Licensing is state by state, so this is Texas only.Source: Texas TDLR — Electrician Exam Statistics, Fiscal Year 2025
Where to focus first
Services, service equipment and separately derived systems is among the heaviest areas (about 18% in Texas), plus the load-calculation portion.

Fees and salaries are approximate and change over time. The pass rate above is quoted from the source linked beside it, for the period that source covers — where we have not checked a source, we say so and give no number.

Report