Loading & TransportPregunta 31 de 80

What must you check before loading a package of hazardous material?

a.The manufacturer's stock price
b.The color of the truck
c.That the package is not leaking or damaged
d.The driver's meal schedule

Explicación

Before loading, inspect each package to make sure it is intact and not leaking. Never transport a leaking hazmat package. A damaged or leaking container must be refused or handled according to emergency procedures.

Practica las 80 preguntas gratis — sin registro.

Preguntas relacionadas de este tema

Última revisión: · proceso editorial

Equipo Editorial de PrepPass · Verificado con CDL Hazardous Materials (H) Endorsement Knowledge Test · Cómo revisamos
Reportar