Network OperationsPregunta 52 de 100

Which change management step should occur before implementing a major network change?

a.Immediately push the change during peak hours
b.Skip documentation to save time
c.Disable all monitoring during the change
d.Obtain approval and prepare a rollback plan

Explicación

Sound change management requires securing approval and preparing a rollback plan so the change can be reversed if problems arise. Documentation and scheduling during maintenance windows reduce risk. Skipping these steps increases the chance of prolonged outages.

Practica las 100 preguntas gratis — sin registro.

Preguntas relacionadas de este tema

Última revisión: · proceso editorial

Equipo Editorial de PrepPass · Verificado con CompTIA Network+ (N10-009) · Cómo revisamos
Reportar