SafetyCâu 573 / 700

A large earthwork site keeps tracking mud onto the public street. Which best management practice (BMP) BEST addresses this under the site's storm water plan?

a.Sweep the mud into the storm drain each evening
b.Wash the street with a hose into the gutter
c.Ignore it because rain will wash it away
d.Install a stabilized construction entrance and clean tracked sediment from the street

Giải thích

A stabilized construction entrance of crushed rock knocks mud off tires before vehicles reach pavement, and any tracked sediment should be swept up and disposed of properly, not washed into drains. Options a and b send sediment straight into the storm drain system, a violation. Option c allows pollution to reach waterways. Preventing and cleaning track-out protects water quality and keeps the site compliant.

Luyện miễn phí toàn bộ 700 câu hỏi — không cần đăng ký.

Câu hỏi liên quan cùng chủ đề

Cập nhật gần nhất: · quy trình kiểm tra

Đội Ngũ Biên Tập PrepPass · Đối chiếu với California CSLB General Building (B) Trade Examination · Quy trình kiểm tra
Báo lỗi