Planning & EstimatingCâu 615 / 700
A contractor's annual overhead is $120,000 and expects about $600,000 in direct job costs for the year. To recover overhead evenly, approximately what percentage should be added to each job's direct cost for overhead?
a.12%
b.20%
c.25%
d.5%
Giải thích
Overhead recovery rate = annual overhead / annual direct costs = 120,000 / 600,000 = 0.20 = 20%. Adding 20% of direct cost to each job spreads the overhead across the year's work. Correct answer is 20%. '12%' and '5%' understate the ratio. '25%' would result from dividing 120,000 by 480,000, an incorrect base.
Luyện miễn phí toàn bộ 700 câu hỏi — không cần đăng ký.
Câu hỏi liên quan cùng chủ đề
- A job costs $16,000 and is sold for $20,000. What is the gross MARGIN percentage on the selling price?
- Your direct cost on a job is $9,000. You apply a 30 percent markup ON COST. What is the selling price?
- In construction estimating, which BEST describes the difference between fixed and variable overhead?
- On a lump-sum project, what is the PRIMARY purpose of the schedule of values?
- A progress payment application shows $80,000 of work completed this period. The contract allows 10 percent retention. How much should the owner PAY for this period after retention is withheld?
- A grading and utility project has uncertain quantities of rock excavation that cannot be measured accurately until digging begins. Which contract type is BEST suited?
Cập nhật gần nhất: · quy trình kiểm tra
Đội Ngũ Biên Tập PrepPass · Đối chiếu với California CSLB General Building (B) Trade Examination · Quy trình kiểm tra