Lập kế hoạch & Dự toánCâu 378 / 521
In the bidding process, what is a material takeoff?
a.Removing old wiring from a building
b.A change to the contract price
c.Counting and listing all materials and devices from the drawings
d.The final inspection of the job
Giải thích
A takeoff is the systematic counting and listing of every device, fitting, and length of material shown on the plans so quantities can be priced. It is not demolition, a change order, or an inspection.
Luyện miễn phí toàn bộ 521 câu hỏi — không cần đăng ký.
Câu hỏi liên quan cùng chủ đề
- A dwelling has 9,000 VA of electric heating and 6,000 VA of air conditioning that cannot operate at the same time. What value is included in the service calculation?
- A household range has a calculated demand of 8,000 VA. What maximum value may be used for the neutral (grounded) feeder load for this range?
- In electrical estimating, what does a labor unit represent?
- Where is the California Electrical Code officially published within the California Code of Regulations?
- Which set of California regulations contains the worker-safety rules (Cal/OSHA) that apply to electricians on the job?
- Under the optional dwelling method, at what percentage is the nameplate rating of the air-conditioning equipment included in the heating/AC portion of the calculation?
Cập nhật gần nhất: · quy trình kiểm tra
Đội Ngũ Biên Tập PrepPass · Đối chiếu với California CSLB C-10 Electrical Trade Examination · Quy trình kiểm tra