Load & DesignCâu 8 / 110
After a Manual J load is calculated, which ACCA procedure is used to select the specific equipment model?
a.Manual D
b.Manual T
c.Manual S
d.Manual RS
Giải thích
Manual S matches equipment to the Manual J loads using manufacturer expanded performance data at local design conditions. It ensures the unit meets both sensible and latent loads without gross oversizing. Oversized equipment short-cycles and dehumidifies poorly.
Luyện miễn phí toàn bộ 110 câu hỏi — không cần đăng ký.
Câu hỏi liên quan cùng chủ đề
- The sensible heat formula uses which constant when air volume is in CFM and temperature difference is in degrees F?
- Using the sensible heat formula, how much sensible heat is removed when 1,200 CFM of air is cooled through a 20 degree F temperature drop?
- What does ACCA Manual D provide guidance for?
- Oversizing a residential air conditioner most commonly leads to which problem?
- Which factor increases a building's cooling load the most on a hot afternoon?
- In California, plans for new HVAC systems typically must demonstrate compliance with which energy standard?
Cập nhật gần nhất: · quy trình kiểm tra
Đội Ngũ Biên Tập PrepPass · Đối chiếu với California CSLB C-20 Warm-Air HVAC Trade Exam · Quy trình kiểm tra