Lập kế hoạch & Dự toánCâu 317 / 360
During planning, what is the main reason to record the invert elevation of the sewer point of connection before designing the underground drainage?
a.To pick the fixture color
b.To confirm there is enough fall from the building's lowest fixture to the connection so gravity drainage will work
c.To size the electrical service
d.To choose the paint
Giải thích
The invert elevation is the inside-bottom level of the pipe at the connection; comparing it to the building's lowest fixture confirms there is adequate fall for gravity drainage at the required slope. If the fall is insufficient, the plan may need a sewage ejector or a redesign. Verifying invert and slope up front prevents a system that cannot drain by gravity.
Luyện miễn phí toàn bộ 360 câu hỏi — không cần đăng ký.
Câu hỏi liên quan cùng chủ đề
- When must a plumbing permit generally be obtained relative to starting the work?
- A single-line water piping diagram on the plans is best described as what?
- When planning the drainage layout, why must roof and storm drainage generally be kept separate from the sanitary drainage system?
- A bid schedule shows the plumbing rough-in must be complete before the concrete slab is poured. What does this tell you about coordination?
- Under the CPC, what is the general purpose of requiring a permit and inspections for plumbing work?
- You are counting fixtures for a two-bathroom house: each bathroom has 1 water closet, 1 lavatory, and 1 shower, and the kitchen has 1 sink. How many fixtures go on the rough-in count?
Cập nhật gần nhất: · quy trình kiểm tra
Đội Ngũ Biên Tập PrepPass · Đối chiếu với California CSLB C-36 Plumbing Trade Examination · Quy trình kiểm tra