CSLB Class B — General Building (Trade Exam) · 2026 版
CSLB Class B General Building — Trade Exam Study Guide (2026)
版本说明Written to the 2025 California codes in force since January 1, 2026 — guards are now CRC R321, stairs R318.7.
The trade/craft half of the B license — planning & estimating, framing & structural, core & finish trades, and Cal/OSHA safety. Pairs with the Law & Business book.
- 技术考试 5 章合成一本,PDF + EPUB 永久保存
- 书内 130 道练习题,全部专为本书所写 —— 站上的免费题库里一道都没有
- 5 章每章收尾都有关键数字、点名的考试陷阱与要点回顾
考试报名费(每次报名,首考或重考相同):每次 $51.43,缴给 PSI Services LLC。补考要再交一次。本指南:$29.99,一次买断。
$29.99一次买断 · 永久下载 · 无订阅
PDF + EPUB · 英文 · 348 页 · $29.99 一次买断
本书为英文版,下载的 PDF 与 EPUB 均为英文。
付款后立即下载 —— 无需注册账号,无订阅。
14 天退款保证:任何原因不满意?购买后 14 天内发邮件至 support@preppass.org 即可全额退款。 这是电子下载,无需寄回任何东西。 退款政策
考试事实最近一次对照官方资料核对:2026年9月。
先做 10 题,看看讲解 —— 免费
先答完这 10 题,交卷后每题都有解析 —— 还会指出本指南里讲这一点的那一节。约 5 分钟,无需注册。
开始 10 道免费题翻开这本书看看
三页真实内页,直接从你将下载的 PDF 渲染而来 —— 依次是一页速查、一页讲解、一道带解析的例题。没有任何一页是为了好看而重画的。
- 速查页Part I — Enforcement, recordkeeping, and reporting · PDF 第 221 页
一页可以随时翻回来的内容:把数字、期限或术语集中在一处。
- 怎么讲Practice Exam — 130 Questions · PDF 第 275 页
讲解页:用文字把知识讲清楚,顺序与考试考查的顺序一致。
- 一道题的完整解析Practice Exam — 130 Questions · PDF 第 262 页
一道练习题,连同答案和背后的推理 —— 不只是一个答案键。
不止考一门?有套装价
- CSLB Law & Business — Complete Study Guide (2026)$24.99
- CSLB Class B General Building — Trade Exam Study Guide (2026)$29.99
- CSLB Class C-10 Electrical — Trade Exam Study Guide (2026)$14.99
- CSLB C-20 HVAC Trade Exam Study Guide (2026)$14.99
- CSLB C-27 Landscaping Trade Exam Study Guide (2026)$14.99
- CSLB C-33 Painting Trade Exam Study Guide (2026)$14.99
- CSLB Class C-36 Plumbing — Trade Exam Study Guide (2026)$14.99
- CSLB Law & Business — Cheat Sheet (2026)$9.99
8 件一起买:$79.99 —— 比分开买省 $59.93
分开买 $139.92 · 立减 42% · 一次结账,共 8 件。
已经买过《CSLB Law & Business》了?那就别买套装——套装里含这本,你会重复付费。单独购买《CSLB Class B — General Building (Trade Exam)》只要 $29.99。 CSLB Class B — General Building (Trade Exam) · 套装内容 →
想搭配其他工种考试?

两周内就要考试?
这本指南是系统讲解,要花几周读。如果两周内就考,可打印的彩色速查表是另一款产品:考试涉及的关键数字,按章节排好。
4 页 · US Letter · 可打印 PDF · 永久保存
关于这场考试本身
| 主管机构 | Contractors State License Board (CSLB), California Department of Consumer Affairs —— 考试由 PSI Services LLC 承办 |
|---|---|
| 题目数量 | CSLB 未公布 我们查阅但未找到该数据的来源: CSLB — Step 7: Studying for the Examination |
| 考试时限 | 210 分钟 |
| 及格标准 | CSLB 未公布 我们查阅但未找到该数据的来源: CSLB — Step 7: Studying for the Examination |
| 费用 |
|
| 考试语言 | 英语 · 西班牙语 |
How this book compares
CSLB publishes a free Class B study guide that lists what the trade exam covers. This book teaches that material chapter by chapter with worked examples and practice questions; Peerless Institute sells a printed Class B study guide.
| Resource | Price | What you get | Choose it if |
|---|---|---|---|
| This bookCSLB Class B General Building — Trade Exam Study Guide (2026)PrepPass | $29.99 | Downloadable study guide for the Class B trade exam
| Choose this book if you want the Class B topics taught in one place, with the maths worked step by step and practice questions, as a download you can start today. |
| From the exam bodyClass B General Building examination study guide (opens the publisher's page in a new tab)Contractors State License Board (CSLB) | Free (PDF download) | The board's own study guide for the trade exam
| Read it in any case: it is the board's own list of what the exam covers, and it may be all you need if you already know the trade well. |
| AlternativeCSLB General Building (B): Study Guide (opens the publisher's page in a new tab)Peerless Institute | $150.00 (study guide only); $250.00 with a trade practice exam | Printed study guide for the Class B trade exam
| Choose Peerless if you want a printed, shipped book, or a bundle that adds an online practice exam. |
This book
CSLB Class B General Building — Trade Exam Study Guide (2026)
PrepPass
- Price
- $29.99
- What you get
Downloadable study guide for the Class B trade exam
- 130 practice questions, each with a worked explanation
- 348 pages, PDF + EPUB
- Choose it if
- Choose this book if you want the Class B topics taught in one place, with the maths worked step by step and practice questions, as a download you can start today.
From the exam body
Class B General Building examination study guide (opens the publisher's page in a new tab)
Contractors State License Board (CSLB)
- Price
- Free (PDF download)
- What you get
The board's own study guide for the trade exam
- A breakdown of examination topics, sample examination questions, resource information and test strategy
- Choose it if
- Read it in any case: it is the board's own list of what the exam covers, and it may be all you need if you already know the trade well.
Alternative
CSLB General Building (B): Study Guide (opens the publisher's page in a new tab)
Peerless Institute
- Price
- $150.00 (study guide only); $250.00 with a trade practice exam
- What you get
Printed study guide for the Class B trade exam
- Chapters on general building, safety, carpentry, electrical, concrete, plumbing, roofing, a mathematics review, and plans and specifications, among others
- Choose it if
- Choose Peerless if you want a printed, shipped book, or a bundle that adds an online practice exam.
Other resources' prices and contents are as listed on each publisher's or seller's own page, checked September 24, 2026. Prices change; confirm on the linked page before you buy. This book's price and contents come from our own catalog.
Sources (2)
- https://www.cslb.ca.gov/Contractors/Applicants/Examination_Study_Guides/ — read September 24, 2026
- https://www.peerlessinstitute.com/products/peerless-study-guide-general-building-b — read September 24, 2026
包含什么,不包含什么
包含
- Every chapter closes the same way: key numbers & facts, the exam traps named one by one, and the takeaways — so the night before is a re-read, not a re-study
- 58 worked examples with every step shown — concrete by the cubic yard, board feet, water-cement ratio, swell, slope factor, labor burden, CPM float
- Planning, plan-reading, takeoffs, and estimating math worked by hand
- Framing & structural: spans, spacing, seismic hardware, load path
- Core & finish trades, envelope, EERO, GFCI/AFCI, fire ratings
- Cal/OSHA safety at the CURRENT limits: lead PEL 10 µg/m³ (not the federal 50), residential framing fall protection at 6 ft, trenching, heat illness, silica
- 130 original practice questions with a worked explanation on every one — and no length tell: taking the longest, second-longest, third or shortest option each pays about 25%, the same as guessing
- Written to the 2025 Title 24 code cycle, with a per-chapter Sources list so you can check any figure at its source
- PDF (print & tab it) + EPUB (phone / e-reader)
不包含
- 不寄送纸质书 —— 这是一份你下载后可自行打印的文件
- 购书不含视频课程、讲师或一对一辅导 —— 站上的免费视频是另一回事
- 不含考试报名费与考点费用,这些仍需向官方机构缴纳
目录
查看 12 个部分及各部分起始页
- Chapter 1 — Planning & Estimating第 11 页
- Chapter 2 — Framing & Structural第 41 页
- Part I — Siding, stucco, and the water-resistive barrier第 73 页
- Chapter 3 — Core Trades第 89 页
- Chapter 4 — Finish Trades第 158 页
- Chapter 5 — Safety第 193 页
- Part I — Enforcement, recordkeeping, and reporting第 219 页
- Practice Exam — 130 Questions第 233 页
- Appendix A — Formulas and Conversions Quick Reference第 285 页
- Appendix B — Consolidated Key Numbers, with edition flags第 292 页
- Appendix C — Glossary of Trade Terms第 337 页
- Appendix D — Exam-Day Strategy第 344 页
取自你将下载的那份 PDF,并标明各章起始页 —— 不是在此手工录入的。
免费读完整一章
完整的一章,与电子书正文一字不差。直接在此窗口滚动阅读;无需下载,无需邮箱。
在本页直接阅读第 3 章
我们没有拿轻松的绪论充数 —— 免费章节直接翻到书里最见功力的部分,让你在考试真正难的地方检验这本书讲得好不好。
Introduction
Core Trades is nearly a third of the examination and it is spread across seven subjects: concrete, electrical, plumbing, HVAC, roofing, insulation and weatherproofing, and earthwork. That arithmetic matters for how you study it. Thirty percent divided seven ways is roughly four questions per trade, which tells you the depth the exam is after.
A Class B general building contractor is not being examined as an electrician, a plumber, or a sheet-metal mechanic. You are being examined on whether you can recognize correct and incorrect work, coordinate the trades so they do not collide, sequence them so nothing is covered before inspection, and catch the defects that will fail an inspection or hurt somebody. The exam's own published sample questions sit at the depth of "what is the minimum width of a residential hallway" — recognition, not design.
So this chapter teaches the numbers a general contractor is genuinely expected to know, works the arithmetic that appears on the test, and deliberately stops short of the trade-design material a specialty contractor owns. Where a figure could not be verified against its primary source, it is not in this book. A missing number is a gap; a wrong number in a construction book is a hazard.
Code edition. This chapter is written to the 2025 California Building Standards Code (Title 24), effective January 1, 2026 — the 2025 California Plumbing Code (based on the 2024 UPC), the 2025 California Mechanical Code (2024 UMC), the 2025 California Electrical Code (2023 NEC), the 2025 California Energy Code, the 2025 California Residential and Building Codes, and CALGreen. Concrete provisions reference ACI 318-19, which is the edition the California Building Code adopts in its Chapter 35.
One structural change you must know about. In the 2025 cycle, California Building Code Chapter 7A, California Fire Code Chapter 49, and California Residential Code Section R337 were deleted and consolidated into a new Title 24 Part 7 — the California Wildland-Urban Interface Code (CWUIC), effective January 1, 2026. Every "CBC Chapter 7A" and "CRC R337.x" citation you will see in older study material is now a dead citation. The provisions live in CWUIC Chapter 5.
Learning objectives
After working through this chapter you should be able to:
- Compute a water-cement ratio, find the maximum mixing water for a mix, and calculate what adding water on site does to both the ratio and the strength.
- State the concrete cover requirements and pick the right one for a given exposure.
- Select a concrete exposure class and read its maximum w/c and minimum f'c.
- Compute a rebar takeoff for a slab, in lineal feet and in pounds.
- Apply the curing and 28-day test conventions, and the cold-weather and hot-weather thresholds.
- Recognize correct electrical work: conductor ampacity, GFCI and AFCI locations, receptacle spacing, working space, and the 125%/80% continuous-load rule.
- Compute drainage slope and fall, check a trap arm against its maximum length, and total drainage fixture units.
- Apply the water heater rules — relief valve discharge, seismic strapping, and the statute behind it.
- Size combustion air openings by all three methods and know which figure goes with which.
- Apply duct leakage limits for new and altered systems.
- Give the minimum roof slope for each covering — and explain why the answer changes between the Residential and the Building Code.
- Compute attic and crawl space ventilation net free area under both ratios.
- Distinguish R-value from assembly U-factor and say which one Title 24 actually prescribes.
- Compute cut and fill by the average end area method, and run a differential leveling circuit with its arithmetic check.
Part A — Concrete
What concrete is, and what controls it
Concrete is portland cement, water, fine aggregate (sand), coarse aggregate (rock), and usually admixtures. Cement and water react chemically — hydration — and that reaction, not drying, is what makes concrete hard. Concrete does not dry; it cures. Everything else in this part follows from that one fact.
Compressive strength (f'c) is specified in pounds per square inch and, by long convention, tested at 28 days.
The water-cement ratio
The water-cement ratio is the single most important number in a concrete mix. It is the weight of water divided by the weight of cementitious material:
w/c = weight of water ÷ weight of cement
Lower w/c = stronger and more durable concrete. Higher w/c = weaker, more permeable, more prone to shrinkage cracking and to freeze-thaw damage. That relationship is fundamental, and it is why the codes and standards control the ratio directly rather than the strength alone.
ACI 211.1 publishes the relationship, and it is worth reading in the direction the standard actually runs — from a required strength to a maximum ratio, not the other way:
| Required f'c (psi) | Maximum w/c, non-air-entrained | Maximum w/c, air-entrained |
|---|---|---|
| 6,000 | 0.41 | — |
| 5,000 | 0.48 | 0.40 |
| 4,000 | 0.57 | 0.48 |
| 3,000 | 0.68 | 0.59 |
| 2,000 | 0.82 | 0.74 |
ACI 211.1 is a standard practice, not a code section, and this table assumes 6×12-inch cylinders at 28 days with 3/4-to-1-inch aggregate. Air entrainment costs strength at the same ratio — which is the price of freeze-thaw durability.
Worked example 1 — Maximum mixing water
A mix design calls for 600 pounds of cement per cubic yard and a maximum water-cement ratio of 0.45. What is the maximum water, in pounds and in gallons?
- Maximum water = w/c × cement weight = 0.45 × 600 = 270 pounds
- Water weighs 8.34 pounds per gallon
- Gallons = 270 ÷ 8.34 = 32.4 gallons per cubic yard
That is the entire water budget for a cubic yard — and it includes the free moisture already in the aggregate, which on a wet sand pile can be several gallons per yard. A batch plant corrects for aggregate moisture; a crew mixing on site usually does not, which is one reason site-mixed concrete underperforms.
Worked example 2 — The driver adds water at the site
The same 600-lb, 0.45 mix arrives. The crew says it is too stiff and the driver adds 5 gallons per cubic yard at the chute. What is the new water-cement ratio, and what does it do to the strength?
- Added water = 5 gal × 8.34 = 41.7 pounds
- New total water = 270 + 41.7 = 311.7 pounds
- New w/c = 311.7 ÷ 600 = 0.52
The mix was specified at 0.45 and is now at 0.52. Read that against the ACI 211.1 table: 0.48 corresponds to about 5,000 psi and 0.57 to about 4,000 psi, so 0.52 lands between them — this batch will come in somewhere around the low 4,000s where the specification wanted 5,000-plus. Five gallons of water, poured out of a hose in about forty seconds, has cost roughly a sixth of the concrete's strength, along with more shrinkage cracking, more permeability, and a softer surface.
Adding water on site to improve workability is the classic wrong answer on the exam, and the right answers are the ones that improve workability without adding water:
- A water-reducing admixture or a superplasticizer (high-range water reducer), which increases slump with no added water.
- Ordering the correct slump in the first place.
- Placing the concrete sooner, before it stiffens.
The narrow, controlled exception exists and is worth knowing precisely: where the delivered slump is below the specified slump, a one-time addition of water may be permitted at the site, within the mix's design water allowance, followed by the specified mixing revolutions — the project specification and the mix design govern, and it is never a hose-it-down-until-it-flows decision. If water is added past the design allowance, the load should be rejected.
Slump
Slump measures consistency — how far a cone of fresh concrete settles when the cone is lifted, in inches, tested by ASTM C143. Higher slump means a wetter, more workable, weaker mix.
ACI 211.1's recommended slump ranges, which apply only where slump is not specified:
| Construction | Slump (in) |
|---|---|
| Reinforced foundation walls and footings | 1–3 |
| Plain footings, caissons, substructure walls | 1–3 |
| Beams and reinforced walls | 1–4 |
| Building columns | 1–4 |
| Pavements and slabs | 1–3 |
| Mass concrete | 1–2 |
Add 1 inch where the concrete is not consolidated by vibration. These are recommendations from a standard practice, not code requirements, and this book attaches no code section to them.
Admixtures
| Admixture | What it does | When you use it |
|---|---|---|
| Water reducer | More workability at the same water, or the same workability at less water | To hit slump without raising w/c |
| High-range water reducer (superplasticizer) | A large slump increase with no added water | Congested reinforcement, tight forms |
| Accelerator | Speeds set and early strength | Cold weather, fast turnaround |
| Retarder | Slows set | Hot weather, long hauls, large continuous pours |
| Air-entraining | Creates microscopic air bubbles | Freeze-thaw exposure |
| Corrosion inhibitor | Protects reinforcement | Marine and deicing-salt exposure |
Two exam points. Calcium chloride accelerators corrode reinforcement and are restricted or prohibited where steel is present and in some exposure classes. And air entrainment costs compressive strength — roughly what the ACI 211.1 table's two columns show — which is exactly why it is required only where freeze-thaw demands it.
Exposure classes — ACI 318-19 Table 19.3.2.1
Durability, not strength, drives most concrete requirements. ACI 318 assigns each element an exposure class and sets a maximum w/c and a minimum f'c for each:
| Class | Exposure | Max w/c | Min f'c (psi) |
|---|---|---|---|
| F1 | Freeze-thaw, limited water contact | 0.55 | 3,500 |
| F2 | Freeze-thaw, frequent water contact | 0.45 | 4,500 |
| F3 | Freeze-thaw with deicing chemicals | 0.40 | 5,000 |
| S1 | Moderate sulfate | 0.50 | 4,000 (Type II cement) |
| S2 | Severe sulfate | 0.45 | 4,500 (Type V, no calcium chloride) |
| S3 | Very severe sulfate | 0.45 / 0.40 | 4,500 / 5,000 |
| W2 | In contact with water, low permeability required | 0.50 | 4,000 |
| C2 | Corrosion protection of reinforcement required | 0.40 | 5,000 |
Note the pattern that makes these memorable: the worse the exposure, the lower the allowed ratio and the higher the required strength, and the two move together because they are two views of the same property — permeability.
Separately, and for residential work more often controlling, CRC Table R402.2 sets 2,500 psi for foundations and interior slabs, 3,000 for exterior vertical work in moderate and severe weathering, and 3,000 / 3,500 for porches, carport slabs, exterior steps, and garage floor slabs — with R404 requiring 3,000 psi for foundation walls in Seismic Design Category D0, D1, or D2, which covers most populated California. The CBC §1904.1 defers to ACI 318, with an exception permitting 3,000 psi for Group R-2 and R-3 occupancies of three stories or fewer.
Air content
ACI 318-19 Table 19.3.3.1, total air content by nominal maximum aggregate size:
| Nominal max aggregate | Class F1 | Classes F2 and F3 |
|---|---|---|
| 3/8 in | 6.0% | 7.5% |
| 1/2 in | 5.5% | 7.0% |
| 3/4 in | 5.0% | 6.0% |
| 1 in | 4.5% | 6.0% |
| 1-1/2 in | 4.5% | 5.5% |
| 2 in | 4.0% | 5.0% |
| 3 in | 3.5% | 4.5% |
F2 and F3 share one column. Field tolerance is ±1.5 percent. And note the direction: smaller aggregate needs more air, because air is protecting the paste and a smaller-aggregate mix has more paste.
For comparison, CRC Table R402.2 puts residential air entrainment, where required, at 5 to 7 percent — with a steel-troweled garage floor permitted to drop to 3 percent air if f'c is raised to at least 4,000 psi, because entrained air and steel troweling fight each other and produce surface blistering and delamination.
Reinforcement and cover
Concrete is strong in compression and weak in tension. Steel carries the tension. The bond between them works because steel and concrete have nearly the same coefficient of thermal expansion — they move together.
ASTM A615 bar properties, which the takeoff arithmetic runs on:
| Bar | Nominal diameter | Nominal area | Weight |
|---|---|---|---|
| #3 | 0.375 in | 0.11 in² | 0.376 lb/ft |
| #4 | 0.500 in | 0.20 in² | 0.668 lb/ft |
| #5 | 0.625 in | 0.31 in² | 1.043 lb/ft |
| #6 | 0.750 in | 0.44 in² | 1.502 lb/ft |
The bar number is the diameter in eighths of an inch — a #4 is 4/8 = 1/2 inch, a #6 is 6/8 = 3/4 inch. Use the ASTM nominal areas above rather than computing π d² ÷ 4, which gives slightly different figures (0.196, 0.307, 0.442) and will make your arithmetic disagree with every published table.
Concrete cover — ACI 318-19 Table 20.5.1.3.1. Cover protects the steel from corrosion and fire, and it is the most commonly violated requirement on a residential jobsite:
| Condition | Cover |
|---|---|
| Cast against and permanently in contact with ground | 3 in |
| Exposed to earth or weather, #6 through #18 | 2 in |
| Exposed to earth or weather, #5 and smaller | 1-1/2 in |
| Not exposed — slabs, joists, walls, #14 and #18 | 1-1/2 in |
| Not exposed — slabs, joists, walls, #11 and smaller | 3/4 in |
| Not exposed — beams, columns, pedestals, and ties | 1-1/2 in |
Worked example 3 — Two cover questions
(a) A grade beam is cast directly against earth on its sides and bottom. The crew sets #5 bars on 1-1/2-inch chairs. Correct? (b) A formed foundation wall is exposed to weather and has #5 vertical bars. How much cover?
(a) No. Concrete cast against and permanently in contact with ground requires 3 inches of cover. The 1-1/2-inch figure the crew used is the value for beams and columns not exposed to earth or weather — a real number, applied to the wrong condition. Three inches is required because an earth-formed surface is rough and irregular, and because the steel is in permanent contact with soil moisture. Reinforcement with inadequate cover rusts, and rusting steel expands roughly seven times its own volume, which spalls the concrete off and exposes more steel. The failure is slow, certain, and expensive.
(b) 1-1/2 inches. Exposed to earth or weather, #5 and smaller get 1-1/2 inches; #6 through #18 get 2 inches. The bar size changes the answer, which is exactly what the exam is testing — and it is why "the cover is two inches" is not a complete answer to any cover question.
Worked example 4 — A rebar takeoff
A slab 20 ft × 24 ft is reinforced with #4 bars at 18 inches on center each way. How many lineal feet of steel, and how many pounds?
Run each direction separately, and remember that bars running one way are spaced out along the other dimension.
Bars running the 24-foot direction, laid out across the 20-foot width:
- 20 ft = 240 in; spaces = 240 ÷ 18 = 13.33 → 14 spaces
- Bars = 14 + 1 = 15 bars, each 24 ft = 360 lineal feet
Bars running the 20-foot direction, laid out across the 24-foot width:
- 24 ft = 288 in; spaces = 288 ÷ 18 = 16 spaces
- Bars = 16 + 1 = 17 bars, each 20 ft = 340 lineal feet
Totals:
- Lineal feet = 360 + 340 = 700 lf
- Weight = 700 × 0.668 lb/ft = 467.6 pounds, or about 0.23 ton
Then add for laps and waste, which this calculation deliberately does not include: a 24-foot run has to be spliced from stock lengths, and lap length is set by the structural drawings. The familiar "40 bar diameters" rule of thumb — 40 × 0.5 = 20 inches for a #4 — is worth knowing and worth labeling honestly: it is a field rule of thumb for concrete, and it is not in ACI 318. ACI 318 sets tension lap splices as Class A = 1.0 ℓd or Class B = 1.3 ℓd, with a 12-inch minimum, where the development length ℓd itself varies with concrete strength, bar grade, cover, spacing, and coating. A 40-bar-diameter minimum is real code — for masonry, at IBC §2107.2.1. Take the lap from the structural drawings, not from a rule of thumb.
The traps in this question type: laying out along the wrong dimension (it halves or doubles the count), the fence-post error (13.33 rounds to 14 spaces, which is 15 bars), and rounding the spaces down, which would put the bars further apart than the drawing requires.
Worked example 5 — Bags versus a truck
The nine deck piers from Chapter 1 came to 24.74 cubic feet of concrete. How many bags of premix, and should you bag it?
Manufacturer yields (Quikrete, and they are manufacturer data, not code):
- An 80-lb bag yields about 0.60 cubic foot
- A 60-lb bag yields about 0.45 cubic foot
So:
- 80-lb bags = 24.74 ÷ 0.60 = 41.2 → 42 bags, weighing 42 × 80 = 3,360 pounds
- 60-lb bags = 24.74 ÷ 0.45 = 55 bags
And the conversions worth memorizing: a cubic yard is 27 cubic feet, which is 45 bags of 80-lb mix or 60 bags of 60-lb mix.
Forty-two bags is roughly an hour and a half of mixing for two people, plus the risk of batch-to-batch variation across 42 separate mixes. Against that, 24.74 cubic feet is 0.92 cubic yard, and a ready-mix load at that size carries a short-load charge. The honest answer is that this pour is right at the crossover, and the decision turns on access, on whether the piers must be monolithic, and on whether anyone will actually add the right amount of water to bag number 37.
Normalweight concrete weighs roughly 140 to 150 pounds per cubic foot (NRMCA), so a cubic yard weighs about 4,000 pounds — two tons. That figure decides whether the truck can reach the pour and whether the slab you are demolishing needs a dumpster or three.
Placing, consolidating, curing, and testing
- Do not over-vibrate and do not move concrete with the vibrator. Vibration consolidates and releases entrapped air; too much of it segregates the mix, driving the coarse aggregate down and the paste up. Honeycombing — voids with exposed aggregate at a formed face — is a consolidation failure.
- Cure it. ACI 318-19 §26.5.3.2 requires concrete to be maintained above 50°F and in a moist condition for at least 7 days; high-early-strength concrete for at least 3 days. Note the wording: the 3-day case is "other than high-early-strength" reversed — it is a property of the concrete, not a cement type. ACI 308R gives the curing periods by cement type: Type I 7 days, Type II 10 days, Type III 3 days, Type IV and V 14 days. ACI 301 allows an early end to curing at 70 percent of f'c, which is a specification provision rather than a code one.
- Test it. ACI 318-19 §26.12.1.1(a): a strength test is the average of two 6×12-inch cylinders or three 4×8-inch cylinders, sampled per ASTM C172, cured per ASTM C31, and tested per ASTM C39 at 28 days. One cylinder is not a test.
- Cold weather — ACI 306R-16 §2.2: cold weather exists when the air temperature has fallen to, or is expected to fall below, 40°F during the protection period. Minimum concrete temperature as placed, from ACI 306R: 55°F for sections under 12 inches, 50°F for 12 to 36 inches, 45°F for 36 to 72 inches, and 40°F for over 72 inches — thin sections need to be warmer because they lose heat faster. Protect from freezing; use accelerators, heated water or aggregate, insulating blankets, and enclosures.
- Hot weather — ACI 305R-20 §2.2 sets no numeric threshold. Anyone who tells you "ACI 305 defines hot weather as above 90 degrees" is quoting a citation that does not exist. What is specified: ACI 301 and ACI 305.1 cap concrete discharge temperature at 95°F. Hot-weather practice is retarders, chilled water or ice, shading the aggregate, wetting the subgrade and forms, pouring early or at night, and curing immediately — because in hot, dry, windy conditions the surface can lose water faster than bleed water reaches it, which is what produces plastic shrinkage cracking within the first hours.
购买前
- 怎么拿到?
- 付款后下载入口立即出现在本页,链接同时发到你的邮箱。无需注册账号。
- 不合适怎么办?
- 14 天内发邮件即可全额退款,无需理由。
- 免费练习会取消吗?
- 不会。站上的每一道练习题、计时模考和免费章节都继续免费。这本书是「学」的那一半,不是把免费部分围起来的门。
- 能在手机上看吗?
- 可以 —— EPUB 适合手机和电子书阅读器,PDF 适合打印和贴标签,两种都给你。
详细信息
The trade/craft half of the B license — planning & estimating, framing & structural, core & finish trades, and Cal/OSHA safety. Pairs with the Law & Business book.
- Format: PDF + EPUB download · 348 pages
- 130 practice questions in the book, with a full answer key
- 700 free practice questions for this exam on PrepPass, included at no cost
- $29.99 one-time — no subscription
- 14-day money-back guarantee · refund policy
- Cross-referenced against: California Building Code (CBC/CRC) / Cal-OSHA Title 8
- Last updated: September 2026
- 官方来源核验(California Building Code (CBC/CRC) / Cal-OSHA Title 8)
- 700 道免费练习题
- 即时下载,永久拥有
“The book helped me figure out what I actually needed to memorize and the practice questions showed me where I was weak.”
均为学员本人授权分享的个人经历,不代表通过率。
CSLB exam prep course 要 $200–$800。这本书讲的是同一门考试 —— 同样的规则、核对到最新标准 —— 只需一次性 $29.99,永久归你。
练习免费,为什么还要买书?
我们的练习题和计时模考一直免费 —— 网站上的东西不会因为这本书而收起来。这本 $29.99 的书是「学」的那一半:知识本身,按顺序讲清楚,存成一份属于你的文件。
- 系统讲解 —— 每个考试部分按章节从头讲到尾,不只是题目
- 可打印可贴标签 —— 一份适合打印的 PDF,能划重点、做批注、带到书桌前
- 随处离线学 —— EPUB 放手机或电子书阅读器;不用 wifi,不用一堆浏览器标签
- 全在一处 —— 章节和练习题都在同一份文件里
- 永久归你 —— 一次 $29.99,即时下载,无订阅
而且零风险:14 天退款保证 —— 不满意?发邮件即可全额退款,无需理由。 详见退款政策。
14 天退款保证 · 全额退款,无需理由。
一次购买,永久下载访问。此电子书是完整的 CSLB Class B — General Building (Trade Exam) 学习指南,含 PDF 与 EPUB。仅为教育性摘要,非专业或法律意见 —— 请始终以官方来源核实当前规定。最后更新:September 2026。