Treatment
Treatment questions cover how termiticides and wood treatments are applied, how the main methods work, and the safety, notice and record duties that attach to every application.
Soil treatment
Liquid termiticide is placed in the soil beside and beneath the foundation to form a continuous treated zone. Trenching opens the soil along the footing; rodding injects dilution deeper through a hollow rod at the spacing the label gives; backfill is treated as it is returned. Under slabs, holes are drilled, dilution is injected at low pressure so that it spreads laterally, and the holes are plugged. Hollow block voids are treated through drilled openings. Any untreated gap is a path for termites.
Repellent, non-repellent and bait
Repellent termiticides keep termites away from treated soil. Non-repellents cannot be detected, so termites tunnel into the treated zone and pick up a lethal dose. Baits rely on a slow-acting toxicant, often an insect growth regulator, which foragers share before they die; the effect is colony decline. In-ground stations are placed in soil round the structure and above-ground stations are fixed over active tubes or wood.
Drywood termites and beetles
Local treatment places dust, liquid or foam into galleries through drilled holes; it kills only where it reaches. Whole-structure heat raises the core of the timbers to a lethal temperature and holds it, with probes in the thickest members. Fumigation is performed by a Branch 1 company. Borates diffuse into bare, unfinished wood, act as a stomach poison to insects and inhibit decay fungi, and leach where wood is wetted.
Fungus
Decay fungi cannot be cured by chemistry alone. The moisture condition is corrected first; surface fungus on sound wood may then be treated or left, and weakened wood is dealt with as a repair.
Safety, notice and records
The label sets the rate, sites, protective equipment and environmental precautions, and must be at the site. Occupants receive the section 8538 notice before application. Filling equipment is protected by an air gap or backflow device. A spill is controlled, contained and cleaned up. After treatment, a completion tag showing the firm, date, pesticide trade name and active ingredient or method is posted beside the inspection tag. Pesticide use records are kept three years, monthly use reports go to the county agricultural commissioner, and the company registers each year in every county where it works.
How this area is tested
Expect questions on why a method works or fails for a given pest: fumigant for a soil colony, soil treatment for drywood termites, fungicide on wet wood. Expect the label to be the right answer whenever a question asks what governs rate, equipment or site.
Keep going: the full California Structural Pest Control Field Representative — Branch 3 (Termite) guide covers every section of the exam. Branch 3 Field Representative Exam — California Termite Study Guide, 2027 Edition — PDF + EPUB, $14.99 · 14-day refund →

Practice stays free. The full California Structural Pest Control Field Representative — Branch 3 (Termite) study guide is the material itself, taught start to finish — a downloadable PDF + EPUB you keep.