Branch 3 Field Representative Exam — California Termite Study Guide, 2027 Edition cover

Study guide · 2026 Edition

Branch 3 Field Representative Exam — California Termite Study Guide, 2027 Edition

PrepPass's independent 2026 study guide for the California Structural Pest Control Field Representative — Branch 3 exam is 165 pages including 150 practice questions with a full answer key, PDF + EPUB, $14.99 one-time; it is not affiliated with the exam provider.

Length
165 pages
Practice questions in the book
150
File last updated
November 2026
Delivery
PDF + EPUB · English · instant download

Please read before you buy: An independent study guide, not affiliated with or endorsed by the Structural Pest Control Board, the Department of Pesticide Regulation, the University of California or PSI.

Read the rest of this notice

Every practice question is original, not a real or recalled exam item. The pesticide label always controls.

What is in the California Structural Pest Control Field Representative — Branch 3 (Termite) study guide?

For the Structural Pest Control Board's Field Representative Branch 3 (Termite and Wood-Destroying Pests) exam: 150 questions in 2½ hours, 70 percent to pass. Five chapters in the handbook's five content areas and a full 150-question practice exam.

Exam facts, who it suits and what changed

Look inside the book

Three real pages, rendered straight from the PDF you download — a reference page, a teaching page, and a worked question, always in that order. Nothing here was redrawn to look better.

  • Quick reference
    Chapter 2: Reporting and Recordkeeping · PDF page 42
  • How it's taught
    Answers and explanations · PDF page 164
  • A question, worked
    Chapter 2: Reporting and Recordkeeping · PDF page 45

What's included — and what isn't

Included

  • Five chapters in the handbook's five content areas, with the official weights
  • A full 150-question practice exam with an answer key and an explanation for every question

Not included

  • No printed copy is shipped — this is a file you download and can print yourself
  • No video course, instructor or tutoring comes with the book — the free videos on the site are separate
Everything included, and everything that isn't

Included

  • The inspection report rules: B&P §8516 and 16 CCR §1990 to §1993, with the report categories compared
  • Wood-destroying pests and conducive conditions compared side by side in tables
  • Key numbers and deadlines, worked examples and exam traps in every chapter
  • What changed in the Board's examination regulations on October 1, 2026, and a four-week study plan
  • PDF (print it) + EPUB (phone / e-reader)

Not included

  • Not your exam registration or the testing centre's fee, which you still pay to the official body

Contents

See 8 sections and the page each one starts on
  1. Chapter 1: Inspectionp. 12
  2. Chapter 2: Reporting and Recordkeepingp. 30
  3. Chapter 3: Planningp. 48
  4. Chapter 4: Treatmentp. 69
  5. Chapter 5: Repairs and Corrective Measuresp. 87
  6. Practice examinationp. 103
  7. Answer keyp. 140
  8. Answers and explanationsp. 143

Taken from the PDF you download, with the page each one starts on — not typed here.

Read a chapter free, in full

One complete chapter, exactly as it ships in the eBook. Scroll the window to read it right here; no download, no email.

Read chapter 1 here, without leaving the page
FREE SAMPLE — READ IT RIGHT HERE
Chapter 1 · 33% of the exam · ≈10 min read
Inspection
scroll ↓

Inspection is the largest area of the outline and the base of everything else. The outline describes it as determining the presence and characteristics of wood-destroying pest infestations and infections, identifying treatment needs, and identifying repairs and corrective measures. In practice that is three skills, and the examination tests each one:

  1. Knowing who may inspect, what must be inspected, and what an inspection triggers under the law.
  2. Recognizing the organism from the evidence it leaves.
  3. Recognizing the conditions that invite an organism that has not yet arrived, and the areas you could not see.

1.1 The inspection is the legal gate

The idea. Under B&P §8516(b), a registered company or licensee may not start work on a contract, and may not sign, issue or deliver any document expressing an opinion about the presence or absence of wood-destroying pests or organisms, until an inspection has been made by a licensed Branch 3 field representative or operator employed by a registered company. Section 8514(a) says the same thing for Branch 2 and Branch 3 companies generally: no work and no opinion until the company has completed an inspection.

Why. A statement such as "this house is clear" moves money in a real-estate sale. The Act makes sure that statement can only come from a licensed person who actually looked.

How it is tested. Scenario questions describe someone other than a Branch 3 licensee forming an opinion: an office employee quoting from photographs, an unlicensed salesperson telling an owner the eaves "have termites", a contractor asked for a clearance letter. The answer is always that the inspection by a Branch 3 licensee comes first.

Know the people involved:

PersonWhat the Act lets them doSection
Field representativeSecure work, identify infestations or infections, make inspections, apply pesticides, submit bids or otherwise contract, on behalf of a registered company. May not contract or perform pest control work on his or her own behalf.B&P §8507
Registered companySecure work, submit bids, contract. Employs licensed field representatives and operators to identify, inspect and represent it.B&P §8506.1
Unlicensed employee doing the workMay work on a Branch 1, 2 or 3 contract only after an operator or field representative has fully completed the negotiation or signing of the contract.B&P §8506.1
Unlicensed employee applying pesticideFor 90 days from the date of employment, may apply Branch 2 or Branch 3 pesticides for training, with a licensed field representative or operator present at all times. The 90 days cannot be extended.B&P §8551.5
Unlicensed solicitorMay introduce consumers to the company, hand out advertising literature and set appointments. May not inspect, identify pests, claim safety or efficacy, quote prices other than those printed in company literature, or give an opinion on the need for work.B&P §8550
Officer, partner or employee authorized by the companyMay submit a bid after an inspection by a licensee, or sign a contract after negotiation by a licensee.B&P §8515
Licensed contractorMay remove and replace wood damaged by wood-destroying pests if incidental to other work or identified by a structural pest control inspection report.B&P §8556

A licensee must also tell clients that he or she is licensed by the Structural Pest Control Board. The regulation allows three ways: verbally when services are requested, on a business card, or by the license number printed on the inspection report form (16 CCR §1937.17).

Two more rules belong here because they are triggered by starting an inspection, not by finishing one:

  • A report is owed once the inspection begins. A written report must be prepared and delivered whether or not the company offered the inspection free of charge, and granting permission to inspect counts as a request to inspect (16 CCR §1996(a)). If the person who ordered the inspection refuses to pay, the company that has commenced the inspection must still prepare and deliver the report (16 CCR §1996(b)).
  • The clock runs from the start. The report is due within 10 business days from the start of the inspection, and the property address must be filed with the Board no later than 10 business days after the commencement of the inspection (B&P §8516(b)). Chapter 2 covers both in full.

1.2 What "an inspection" covers

A complete inspection covers all visible and accessible portions of the structure (16 CCR §1993(b)). The statute and the regulation list the parts the report must give information about. Read the two lists once and notice how much of the building they name:

  • From B&P §8516(b)(7): the substructure, foundation walls and footings, porches, patios and steps, air vents, abutments, attic spaces, roof framing including the eaves, rafters, fascias, exposed timbers, exposed sheathing, ceiling joists and attic walls, and other parts subject to attack.
  • From 16 CCR §1990(e): all accessible areas including the substructure, foundation walls and footings, porches, patios and steps, stairways, air vents, abutments, stucco walls, columns, attached structures and other parts normally subject to attack.
  • From 16 CCR §1990(g): any wooden deck, wooden stairs or wooden landing in exterior exposure that is attached to or touching the structure. Portions that cannot be seen must be designated inaccessible.

The roof. The inspection does not have to include the exterior surface of the roof, but the report must say which way it went. One of two statements is printed in bold: either the exterior surface of the roof was not inspected and the reader should contact a roofing contractor licensed by the Contractors State License Board to determine water tightness, or the exterior surface of the roof was inspected to determine whether wood-destroying pests or organisms are present (B&P §8516(b)(8)). Note what the second statement does not say: even when the roof is inspected, it is inspected for pests and organisms, not for water tightness.

A decision routine for the inspection. The Act does not prescribe the order in which you walk a building. The routine below is a study device that makes sure every listed part is reached:

  1. Exterior first: grade against the foundation, stucco and siding at the soil line, planters, attached decks, stairs and landings, vents, eaves, fascia and exposed rafter tails.
  2. Garage and interior: door and window frames, baseboards, plumbing walls, bath floors, the ceiling below any upstairs shower.
  3. Attic: rafters, ceiling joists, sheathing, attic walls, evidence of roof leaks.
  4. Subarea: clearance, debris, earth-wood contact, foundation walls and footings, mudsill, joists, subfloor, plumbing leaks, ventilation.
  5. Water-test stall showers that can be tested (section 1.8).
  6. Post the inspection tag and note any other tags (section 1.9).
  7. Before leaving, list every area you did not inspect and why (section 1.7).

1.3 Termites

UC IPM counts at least 23 termite species in California and sorts the ones that matter to structures into three groups by where they nest. The examination tests the groups by their evidence.

Castes. A termite colony has workers (wingless, soft-bodied, light caramel in color), soldiers (larger, with amber or brownish heads and enlarged mandibles) and reproductives. Winged reproductives, called alates or swarmers, have two pairs of wings of equal size, and they shed them after swarming. Piles of shed, equal-length wings on a sill are evidence of a swarm.

SubterraneanDrywoodDampwood
Main California genusReticulitermes (western subterranean); also Heterotermes in the desert southeast and Formosan CoptotermesIncisitermes minor, the western drywood termiteZootermopsis
Where the colony livesIn the soilAbove ground, inside dry sound woodIn very moist wood, mostly along the cool, humid coast
Soil connectionYes. Reaches wood through earthen shelter tubesNone neededNot required; needs wet wood
Colony sizeTens to hundreds of thousandsSmall, usually fewer than 1,000; takes years to mature—
Signature evidenceShelter tubes of soil, saliva and bits of wood or drywall; soil in galleries; feeding that follows the grain and leaves the harder summerwoodFecal pellets with six flattened longitudinal sides, pushed out of kickout holes less than 2 mm across and piling up belowLarge open galleries in wet wood; pellets elongated, rounded at both ends, without clear ridges
SwarmingReticulitermes: warm sunny days after fall or spring rainsDaytime, summer and fallLarger swarmers, attracted to lights
What it tells youLook for the soil route and moistureLook for more colonies; pellets do not show extentA moisture problem or decay is present

Subterranean termites in more detail. UC IPM calls Reticulitermes the most destructive termites in California. The swarmers are dark brown to brownish-black with brownish-gray wings. Two other subterranean termites appear in identification questions:

  • Heterotermes aureus lives in the Sonoran Desert of southeastern California. It flies in the late afternoon and early evening from July to September and is attracted to lights.
  • The Formosan subterranean termite, Coptotermes formosanus, is established in California but, in UC IPM's words, thus far restricted to a small area near San Diego. It swarms at dusk and in the late evening, is attracted to lights, and can build carton nests above ground.

UC IPM describes four kinds of shelter tube. Learn them by what they do:

TubeWhat it looks like and does
Working tubeThe main highway between the soil and the wood
Exploratory or migratory tubeRises from the soil but does not connect to wood; the colony is searching
Drop tubeHangs down from the wood back toward the soil
Swarm tubeBuilt to release swarmers

Subterranean feeding follows the grain: the softer springwood is eaten and the harder summerwood is left, giving a layered look. Wood may darken or blister, and a thin surface layer may be easy to puncture. Subterranean termites prefer wood that is already decayed, which is one reason moisture matters so much in this branch.

Drywood termites in more detail. The western drywood termite is the second most important termite pest in the state. Its colonies need no connection to the soil and can survive in very dry conditions. The six-sided pellet is diagnostic for drywood termites, but UC IPM is firm about its limits: pellets alone cannot tell you whether the infestation is still active or how far it extends. The suggested check is to clean up the pellets and look again in a few days. Fresh pellets mean activity. That limit is why the regulations require a recommendation to remove or cover accessible pellets (Chapter 3): old pellets that stay in place confuse the next inspector.

UC IPM also notes that the minimum standard for an inspection in California is a visual search of accessible areas. That is the technical reason every certification in this branch speaks only of "visible and accessible areas".

Dampwood termites. Dampwood termites are an indicator species. If they are in a structure, the wood is wet. The finding you write is the termite; the cause you must also report is the moisture.

1.4 Wood-boring beetles

The larvae do the damage; the adults leave. What the inspector sees is the round exit hole and the frass (the powder the larva packs behind it). UC IPM sorts the reinfesting beetles into three groups, and the examination loves the differences.

Powderpost (Lyctinae)Deathwatch (Anobiidae)False powderpost (Bostrichidae)
Wood attackedHardwoods only: oak, ash, hickory, mahogany, walnut, and bamboo. Needs high starchMainly softwoods, especially Douglas-fir girders, beams and foundation timbers; old or partly decayed woodHardwoods and sometimes softwoods
MoistureCan use wood as dry as 8% moisturePrefers wood above 14% moisture; damp subareas—
FrassFine as talcum powder or flourGritty, small pelletsCoarse, tightly packed, hard to dislodge
Exit hole (the ballpoint-pen test)Only the tip of the pen fitsThe tip and part of the angled face fitThe entire pen point fits
Life cycleThree months to more than a yearAbout two years per generation—
Other notesTypical in flooring, paneling, furnitureTypical in the substructureFemales bore egg tunnels; adults about 1/4 inch; includes the leadcable borer

Use the table as a sorting routine: hardwood and flour, think powderpost; softwood framing in a damp subarea and grit, think deathwatch; coarse packed frass that will not shake out, think false powderpost.

Beetles that do not reinfest. UC IPM states that roundheaded borers, flatheaded borers and bark beetles are forest insects that cannot reinfest structural wood. They came in with the lumber. The same is true of wood wasps and horntails (family Siricidae): they emerge from infested lumber in new buildings through round holes 1/4 to 1/2 inch across, the damage is cosmetic, they do not reinfest structures, and no treatment is needed. Questions about holes appearing through new drywall or flooring in a recently built house are usually pointing here.

Open the free chapter →

Questions buyers ask

How do I get it?

Pay, and the download appears on this page straight away. The links are also emailed to you. No account is required.

What if it isn't for me?

Email us within 14 days for a full refund, no questions asked.

Is the free practice going away?

No. Every practice question, the timed mock and the free chapters on this site stay free. This book is the studying half, not a gate around the free half.

More questions (8)
Can I read it on my phone?

Yes — the EPUB is for phones and e-readers, the PDF is for printing and tabbing. You get both.

Is a study guide enough for the California Structural Pest Control Field Representative — Branch 3 (Termite) exam, or do I need a course?

A book is exam review: it does not replace any education, training or experience your licensing body requires before you may sit the exam, so check those requirements first. For the exam content itself, this 165-page guide teaches the material chapter by chapter with 150 practice questions and explanations inside, and 301 more practice questions are free on PrepPass. A prep course adds live instruction and a set schedule; whether you need one beyond any required education is your call.

What is the cheapest way to prepare for the California Structural Pest Control Field Representative — Branch 3 (Termite) exam?

Start with what costs nothing: 301 practice questions on PrepPass, with explanations and no signup. If you want it taught in one file you keep, the full study guide is $14.99 once. No subscription on any of them.

Does the California Structural Pest Control Field Representative — Branch 3 (Termite) study guide come as a PDF?

Yes — Branch 3 Field Representative Exam — California Termite Study Guide, 2027 Edition downloads as PDF and EPUB, 165 pages. The download link is emailed the moment payment clears and does not expire.

How much does the California Structural Pest Control Field Representative — Branch 3 (Termite) study guide cost?

$14.99, once. There is no subscription and no account to create; the PDF and EPUB files are yours to keep.

Are there free California Structural Pest Control Field Representative — Branch 3 (Termite) practice questions?

Yes — 301 of them, free to use with no signup and an explanation on every one. They are separate from this study guide, which is what you are buying here. The same free, no-account system also has practice modes (adaptive, new questions, spaced review of misses, weak-topic focus, saved, my mistakes); a timed mock exam (50 questions, 150 minutes) with a score report by topic; a 10-question readiness check (about 5 minutes); 5 study chapters. None of it needs this study guide.

Can I read part of the California Structural Pest Control Field Representative — Branch 3 (Termite) study guide before buying?

Yes. A full chapter is free to read on this page — not a summary of one, the chapter itself.

Is this the official California Structural Pest Control Field Representative — Branch 3 (Termite) study guide?

No. This is an independent study guide and is not affiliated with or endorsed by the exam's awarding body. It is written from PSI's Structural Pest Control Board candidate handbook (Field Representative Branch 3 outline), the Structural Pest Control Act (B&P §8500 ff.) and 16 CCR §1900 ff. as amended October 1, 2026, 40 CFR §171.103, DPR publications and UC IPM Pest Notes, read November 2026. Always confirm current requirements with the body that issues your licence.

Why buy the book when the practice is free?

Our practice questions and timed mock stay free — nothing on the site moves behind this book. The $14.99 book is the studying half: the material itself, taught in order, in a file you own.

  • Systematic teaching — every exam section explained chapter by chapter, start to finish, not just questions
  • Print it & tab it — a paper-ready PDF you can highlight, mark up, and bring to your study table
  • Study anywhere, offline — EPUB on your phone or e-reader; no wifi, no browser tabs
  • Everything in one place — the chapters and the practice questions in one file
  • Yours for life — one-time $14.99, instant download, no subscription

Full refund policy

The details

PrepPass team · Verified against PSI's Structural Pest Control Board candidate handbook (Field Representative Branch 3 outline), the Structural Pest Control Act (B&P §8500 ff.) and 16 CCR §1900 ff. as amended October 1, 2026, 40 CFR §171.103, DPR publications and UC IPM Pest Notes, read November 2026 · How we review
  • Verified from the official source(PSI's Structural Pest Control Board candidate handbook (Field Representative Branch 3 outline), the Structural Pest Control Act (B&P §8500 ff.) and 16 CCR §1900 ff. as amended October 1, 2026, 40 CFR §171.103, DPR publications and UC IPM Pest Notes, read November 2026)
  • 301 free practice questions

Also free on PrepPass for California Structural Pest Control Field Representative — Branch 3 (Termite)

Beside this guide, PrepPass has a free study system for the same exam. It needs no account, and buying the guide does not unlock or change it: 301 practice questions with explanations; practice modes (adaptive, new questions, spaced review of misses, weak-topic focus, saved, my mistakes); a timed mock exam (50 questions, 150 minutes) with a score report by topic; a 10-question readiness check (about 5 minutes); 5 study chapters.

Progress is saved in your browser; a free account keeps it across devices. The readiness gauge reflects your own practice, not a prediction of the real exam result. How the practice works

One-time purchase, lifetime access to the download. The eBook is the full California Structural Pest Control Field Representative — Branch 3 (Termite) study guide in PDF and EPUB. Educational summary, not professional or legal advice — always confirm the current rules with the official source. Last updated: November 2026.