Earthwork and Surveying
Earthwork and Surveying is about 15% of the exam: surveying job sites, preparing sites, assessing soil conditions and assessing compaction and expansion. Many questions give a field number — a rod reading, a stake, a density test — and ask what it means. The PrepPass CSLB General Engineering (A) Study Guide covers this section in depth, with worked examples, named traps and a chapter quiz.
Surveying
Elevations come from benchmarks, carried by backsights (added) and foresights (subtracted). Stakes mark cuts and fills measured from their reference hubs.
Site preparation and fills
Clear and grub before earthwork, place fill in thin lifts, and bench into existing slopes.
Soils
Soil behavior is described by grain size, plasticity and density, and compaction is measured by dry unit weight against a laboratory maximum at optimum moisture.
Keep going: the full CSLB Class A — General Engineering (Trade Exam) guide covers every section of the exam. CSLB Class A General Engineering — Trade Exam Study Guide (2026) — PDF + EPUB, $24.99 · 14-day refund →

Practice stays free. The full CSLB Class A — General Engineering (Trade Exam) study guide is the material itself, taught start to finish — a downloadable PDF + EPUB you keep.