Subsurface, Surface, and Elevated Piping Work
This is the largest section of the exam at about 21%: shoring and sloping, erosion control, tunneling and boring, installing pipelines, connecting and testing systems, and connecting dry utilities. Cal/OSHA's excavation rules and California's 811 law supply many of the numbers. The PrepPass CSLB General Engineering (A) Study Guide covers this section in depth, with worked examples, named traps and a chapter quiz.
Excavation protection
Cave-in protection is required at 5 feet and deeper (unless in stable rock), chosen by a competent person from soil classification.
Pipelines
Pipe is laid to line and grade on uniform bedding, restrained at bends, tested before burial, and kept away from sewers.
Erosion and tunneling
Sites of an acre or more need stormwater permit coverage; bores of 30 inches or more are tunnel work.
Keep going: the full CSLB Class A — General Engineering (Trade Exam) guide covers every section of the exam. CSLB Class A General Engineering — Trade Exam Study Guide (2026) — PDF + EPUB, $24.99 · 14-day refund →

Practice stays free. The full CSLB Class A — General Engineering (Trade Exam) study guide is the material itself, taught start to finish — a downloadable PDF + EPUB you keep.