Job Site Preparation
CSLB weights Job Site Preparation at about 13% of the B-2 exam: removing non-load-bearing walls, cabinets and countertops, plumbing and electrical fixtures, and delivering and storing materials. This page is a short survey; the PrepPass B-2 Residential Remodeling study guide teaches the section with worked examples and a full practice exam at CSLB's weights.
Wall removal
Verify that a wall is non-bearing before cutting; B-2 contractors may not alter bearing walls. Control utilities and survey for hazardous materials before demolition, and wet the debris.
Cabinets, countertops and fixtures
Remove appliances, then tops, base cabinets and wall cabinets, with water, gas and power off. Shut off, drain, disconnect and terminate fixtures.
Delivery and storage
Keep passageways clear, store flammables in covered containers, keep framing dry and follow the flooring maker's acclimation and subfloor-moisture instructions.
Keep going: the full CSLB B-2 Residential Remodeling guide covers every section of the exam. CSLB B-2 Residential Remodeling Study Guide — 2026 Edition — PDF + EPUB, $24.99 · 14-day refund →
Want the 6-page colour cheat sheet to print for exam week? CSLB B-2 Residential Remodeling cheat sheet PDF — $9.99 →

Practice stays free. The full CSLB B-2 Residential Remodeling study guide is the material itself, taught start to finish — a downloadable PDF + EPUB you keep.