Decks

Bond, slope and joints.

Deck grid
12-by-12-inch grid, at least 3 feet from the water, tied to the four wires before the pre-deck inspection.
City builder guide
Public deck slope
1/8 to 1/4 inch per foot away from the pool.
2025 CBC §3114B.3

Finish, tile and coping

Barrier first, then plaster; markers and handholds keep swimmers safe.

Pre-plaster
Fence, gates and alarms working before plastering.
City builder guide
Depth line
4-to-6-inch tile line at 4-1/2 feet on public pools over 5 feet deep.
2025 CBC §3110B.3
Handhold
Not more than 9 inches above the waterline.
2025 CBC §3112B.1

Keep going: the full CSLB C-53 Swimming Pool guide covers every section of the exam. CSLB C-53 Swimming Pool Study Guide — 2026 Edition — PDF + EPUB, $24.99 · 14-day refund →

Want the 6-page colour cheat sheet to print for exam week? CSLB C-53 Swimming Pool cheat sheet PDF — $9.99 →

Studying in order?

Practice stays free. The full CSLB C-53 Swimming Pool study guide is the material itself, taught start to finish — a downloadable PDF + EPUB you keep.

Get the book — $24.99